OSHA SearchOSHA records by employer

DBR Development Management LLC: OSHA inspections and violations

Dorado, Puerto Rico · New Single-Family Housing Construction (except For-Sale Builders) · NAICS 236115

6inspections
17citation items
$5,392current penalties
Apr 9, 2025last inspection

OSHA has inspected DBR Development Management LLC 6 times in Puerto Rico since 2008.

The latest one began on Apr 9, 2025 after a complaint, in Dorado.

Those inspections ended with 17 citation items: 11 serious and 6 other-than-serious.

Penalties were first proposed at $35,132 and now stand at $5,392, 85% lower after settlements or reviews.

Scaffolds, general requirements comes up most often in these citations: 7 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,079, and DBR Development Management LLC averages $0 (1 cited inspection).

DBR Development Management LLC: OSHA citation items per year, 2008 to 2025
Citation items per year, by inspection date.

Want to know if OSHA cites DBR Development Management LLC again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 348170978 OPENED APR 9, 2025Closed

Complaint · Partial · Safety · 125 employees at the site · Closed Sep 24, 2026

120 State Road No. 693 Proyecto La Cala, Dorado, PR 00646 · Other Building Finishing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.28(a) · Personal protective equipment
Serious$4,250$0Jul 21, 2025Final
Citation 1, item 2
29 CFR 1926.404(b)(1)(i) · Ground-fault protection on job sites
Serious$4,250$0Jul 21, 2025Final
Citation 1, item 3
29 CFR 1926.416(b)(2) · Electrical safety in construction
Serious$1,806$0Jul 21, 2025Final
Citation 1, item 4
29 CFR 1926.451(b)(1)(i) · Scaffolds, general requirements
Serious$2,529$0Jul 21, 2025Final
Citation 1, item 5
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$2,529$0Jul 21, 2025Final
Citation 1, item 6
29 CFR 1926.454 · Scaffold training
Serious$4,250$0Jul 21, 2025Final
Citation 1, item 7
29 CFR 1926.701(b) · Concrete and Masonry Construction: general requirements
Serious$2,168$0Jul 21, 2025Final

Inspection 316679034 OPENED SEP 20, 2012Closed

Unprogrammed related · Complete · Safety · 350 employees at the site · Closed Sep 25, 2012

120 Carr 693 Dorado Beach, Dorado, PR 00646 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 316507730 OPENED JUN 21, 2012Closed

Planned · Complete · Safety · 350 employees at the site · Closed Aug 16, 2012

120 Road 693, Dorado, PR 00646 · New Single-Family Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.403(b)(1) · Electrical equipment on job sites
Serious$1,275$892Aug 2, 2012Closed
Citation 1, item 2
29 CFR 1926.403(e) · Electrical equipment on job sites
Serious$0$0Aug 2, 2012Closed
Citation 2, item 1
29 CFR 1926.403(g) · Electrical equipment on job sites
Other-than-serious$0$0Aug 2, 2012Closed

Inspection 314012055 OPENED JUL 20, 2011Closed

Planned · Complete · Safety · 200 employees at the site · Closed Sep 7, 2011

120 Road 693, Dorado, PR 00646 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 311189872 OPENED MAR 24, 2009Closed

Planned · Complete · Safety · 152 employees at the site · Closed Jun 5, 2009

Carr 693 Km 10.7, Dorado, PR 00646 · New Single-Family Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.404(b)(1)(i) · Ground-fault protection on job sites
Other-than-serious$1,050$250May 7, 2009Closed
Citation 1, item 2
29 CFR 1926.405(g)(2)(iii) · Job-site wiring
Other-than-serious$1,100$250May 7, 2009Closed
Citation 1, item 3
29 CFR 1926.451(a)(1) · Scaffolds, general requirements
Other-than-serious$3,500$875May 7, 2009Closed
Citation 1, item 4
29 CFR 1926.451(a)(3) · Scaffolds, general requirements
Other-than-serious$1,050$250May 7, 2009Closed
Citation 1, item 5
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$1,050$875May 7, 2009Closed
Citation 1, item 6
29 CFR 1926.451(f)(3) · Scaffolds, general requirements
Other-than-serious$825$250May 7, 2009Closed
Citation 1, item 7
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$3,500$1,750May 7, 2009Closed

Inspection 311186894 OPENED JUN 13, 2008Closed

Referral · Partial · Health · 198 employees at the site · Closed Sep 24, 2008

120 Road 693 Km 10.7, Dorado, PR 00646 · New Single-Family Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.28 · Personal protective equipment

29 CFR 1926.28(a)

(a) The employer is responsible for requiring the wearing of appropriate personal protective equipment in all operations where there is an exposure to hazardous conditions or where this part indicates the need for using such equipment to reduce the hazards to the employees.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(b)(1)

(b) Examination, installation, and use of equipment—(1) Examination. The employer shall ensure that electrical equipment is free from recognized hazards that are likely to cause death or serious physical harm to employees. Safety of equipment shall be determined on the basis of the following considerations:

29 CFR 1926.403(e)

(e) Splices. Conductors shall be spliced or joined with splicing devices designed for the use or by brazing, welding, or soldering with a fusible metal or alloy. Soldered splices shall first be so spliced or joined as to be mechanically and electrically secure without solder and then soldered. All splices and joints and the free ends of conductors shall be covered with an insulation equivalent to that of the conductors or with an insulating device designed for the purpose.

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.416 · Electrical safety in construction

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.454 · Scaffold training

29 CFR 1926.701 · Concrete and Masonry Construction: general requirements

Other new single-family housing construction (except for-sale builders) employers in Puerto Rico

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.