OSHA SearchOSHA records by employer

Delek US: OSHA inspections and violations

El Dorado, Arkansas · Petroleum Refineries · NAICS 324110

1inspections
7citation items
$54,612current penalties
Mar 1, 2021last inspection

OSHA inspectors have visited Delek US in Arkansas one time.

It opened on Mar 1, 2021 after a fatality or catastrophe, in El Dorado.

In all, OSHA issued 7 citation items: 6 serious and 1 other-than-serious.

The proposed penalties came to $85,820; today they stand at $54,612, 36% less.

The rule cited most here is 1910.119 (process safety management), 4 times.

Among manufacturing employers, the typical cited inspection since 2015 ends with a $4,500 penalty. Delek US averages $54,612 across 1 cited inspection.

Delek US also files yearly injury logs with OSHA, summarized below.

Delek US: OSHA citation items per year, 2021 to 2021
Citation items per year, by inspection date.

Want to know if OSHA cites Delek US again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 345169197 OPENED MAR 1, 2021Closed

Fatality or catastrophe · Partial · Safety · 290 employees at the site · Closed Aug 11, 2022

1000 Mchenry Ave., El Dorado, AR 71730 · Petroleum Refineries · OSHA's record · Phone and website on Google Maps

Incident on Feb 27, 2021: Six employees sustain burns due to naptha fire

At 3:30 p.m. on February 27, 2021, a tractor trailer carrying a heat exchanger tube bundle attempted to cross a wooden ramp, meant to provide a temporary road crossing of Street A between Unit #6 and Unit #9 of the refinery. The ramp covered a two-inch threaded carbon steel pipe that connected the two units. The pipe was used to transfer sour Naphtha from Unit #9 manifold to Unit #6 LNHT stripper column. When employees attempted to use the temporary road crossing while moving the heat exchanger tube bundle, the piping was struck and displaced, resulting in the release of sour Naphtha, which ignited. Six employees were hospitalized for face and body burns.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 4
29 CFR 1910.119(f)(4) · Process safety management
Serious$13,653$13,653Aug 26, 2021Final
Citation 1, item 7a
29 CFR 1910.119(l)(1) · Process safety management
Serious$13,653$13,653Aug 26, 2021Final
Citation 1, item 7b
29 CFR 1910.119(l)(4) · Process safety management
Serious$7,802$0Aug 26, 2021Final
Citation 1, item 7c
29 CFR 1910.119(i)(1) · Process safety management
Serious$13,653$0Aug 26, 2021Final
Citation 1, item 9a
29 CFR 1910.106(c)(3) · Flammable liquids
Serious$13,653$13,653Aug 26, 2021Final
Citation 1, item 9b
29 CFR 1910.106(c)(4) · Flammable liquids
Serious$13,653$0Aug 26, 2021Final
Citation 2, item 1
29 CFR 1910.106(c)(7) · Flammable liquids
Other-than-serious$9,753$13,653Aug 26, 2021Final

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the El Dorado site logged 1 recordable injury or illness among about 250 workers: 0.3 per 100 full-time workers, against a median of 0.6 for its industry.

Site and yearWorkersCasesDays-away casesRateIndustry median
Lion Oil
El Dorado · 2025
250 100.30.6
DKL Transportation, LLC El Dorado, AR
El Dorado · 2022
68 000.02.9
Lion Oil Transportation El Dorado, AR
El Dorado · 2022
32 000.02.9
Delek US - El Dorado Refinery
El Dorado · 2019
304 110.30.6
Lion Oil Company
El Dorado · 2016
308 300.90.6

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.106 · Flammable liquids

29 CFR 1910.106(c)(3)

(3) Pipe joints. Joints shall be made liquid tight. Welded or screwed joints or approved connectors shall be used. Threaded joints and connections shall be made up tight with a suitable lubricant or piping compound. Pipe joints dependent upon the friction characteristics of combustible materials for mechanical continuity of piping shall not be used inside buildings. They may be used outside of buildings above or below ground. If used above ground, the piping shall either be secured to prevent disengagement at the fitting or the piping system shall be so designed that any spill resulting from such disengagement could not unduly expose persons, important buildings or structures, and could be readily controlled by remote valves.

29 CFR 1910.106(c)(4)

(4) Supports. Piping systems shall be substantially supported and protected against physical damage and excessive stresses arising from settlement, vibration, expansion, or contraction.

29 CFR 1910.106(c)(7)

(7) Testing. All piping before being covered, enclosed, or placed in use shall be hydrostatically tested to 150 percent of the maximum anticipated pressure of the system, or pneumatically tested to 110 percent of the maximum anticipated pressure of the system, but not less than 5 pounds per square inch gage at the highest point of the system. This test shall be maintained for a sufficient time to complete visual inspection of all joints and connections, but for at least 10 minutes.

29 CFR 1910.119 · Process safety management

Other petroleum refineries employers in Arkansas

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.