OSHA SearchOSHA records by employer

Detroit DPW Traffic Engineering Div Street Maintenance Div: OSHA inspections and violations

Detroit, Michigan · Other Automotive Mechanical and Electrical Repair and Maintenance · NAICS 811118

1inspections
31citation items
$27,375current penalties
May 2, 2016last inspection

OSHA inspectors have visited Detroit DPW Traffic Engineering Div Street Maintenance Div in Michigan one time.

It opened on May 2, 2016 as a planned inspection, in Detroit.

In all, OSHA issued 31 citation items: 17 serious, 6 repeat and 8 other-than-serious.

The proposed penalties came to $54,750; today they stand at $27,375, 50% less.

The rule cited most here is 1910.146 (permit-required confined spaces), 4 times.

Among repair and personal services employers, the typical cited inspection since 2015 ends with a $1,200 penalty. Detroit DPW Traffic Engineering Div Street Maintenance Div averages $27,375 across 1 cited inspection.

Detroit DPW Traffic Engineering Div Street Maintenance Div: OSHA citation items per year, 2016 to 2016
Citation items per year, by inspection date.

Michigan · latest 90 days of OSHA records

621employers cited

Get notified the morning OSHA posts each new citation in Michigan: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Michigan

Checking a subcontractor, a client or your own company? Watch Detroit DPW Traffic Engineering Div Street Maintenance Div and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 340173673 OPENED MAY 2, 2016Closed

Planned · Complete · Safety · Local government · 139 employees at the site · Closed Nov 27, 2017

2633 Michigan Ave, Detroit, MI 48216 · Other Automotive Mechanical and Electrical Repair and Maintenance · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 408.10015(3)
Serious$3,500$1,750Jul 27, 2016Final
Citation 1, item 2
29 CFR 408.10034(7)
Serious$2,250$1,125Jul 27, 2016Final
Citation 1, item 3a
29 CFR 408.10220(1)
Serious$2,250$1,125Jul 27, 2016Final
Citation 1, item 3b
29 CFR 408.13390
Serious$0$0Jul 27, 2016Final
Citation 1, item 3c
29 CFR 408.17211(A)
Serious$0$0Jul 27, 2016Final
Citation 1, item 4
29 CFR 408.10446(4)
Serious$1,800$900Jul 27, 2016Final
Citation 1, item 5
29 CFR 408.10716
Serious$2,250$1,125Jul 27, 2016Final
Citation 1, item 6a
29 CFR 408.12131(1)
Serious$1,800$900Jul 27, 2016Final
Citation 1, item 6b
29 CFR 408.12171(1)
Serious$0$0Jul 27, 2016Final
Citation 1, item 6c
29 CFR 408.12171(2)
Serious$0$0Jul 27, 2016Final
Citation 1, item 7
29 CFR 1910.305(b)(2)(i) · Electrical wiring methods
Serious$1,350$675Jul 27, 2016Final
Citation 1, item 8
29 CFR 408.14003(2)
Serious$1,350$675Jul 27, 2016Final
Citation 1, item 9
29 CFR 408.17235(5)
Serious$2,250$1,125Jul 27, 2016Final
Citation 1, item 10a
29 CFR 1910.146(c)(1) · Permit-required confined spaces
Serious$2,250$1,125Jul 27, 2016Final
Citation 1, item 10b
29 CFR 1910.146(c)(2) · Permit-required confined spaces
Serious$0$0Jul 27, 2016Final
Citation 1, item 10c
29 CFR 1910.146(c)(4) · Permit-required confined spaces
Serious$0$0Jul 27, 2016Final
Citation 1, item 10d
29 CFR 1910.146(g)(1) · Permit-required confined spaces
Serious$0$0Jul 27, 2016Final
Citation 2, item 1
29 CFR 408.10447(1)
Repeat$10,000$5,000Jul 27, 2016Final
Citation 2, item 2
29 CFR 408.11852(1)
Repeat$10,000$5,000Jul 27, 2016Final
Citation 2, item 3
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Repeat$12,500$6,250Jul 27, 2016Final
Citation 3, item 1
29 CFR 408.10835(3)
Other-than-serious$0$0Jul 27, 2016Final
Citation 3, item 2
29 CFR 408.11854(1)
Other-than-serious$0$0Jul 27, 2016Final
Citation 3, item 3
29 CFR 1910.303(g)(1) · Electrical equipment, general requirements
Other-than-serious$0$0Jul 27, 2016Final
Citation 3, item 4
29 CFR 1910.304(b)(3)(i) · Grounding and circuit protection
Other-than-serious$0$0Jul 27, 2016Final
Citation 3, item 5
29 CFR 1910.304(g)(5) · Grounding and circuit protection
Other-than-serious$0$0Jul 27, 2016Final
Citation 3, item 6
29 CFR 1910.305(c)(4) · Electrical wiring methods
Other-than-serious$0$0Jul 27, 2016Final
Citation 3, item 7
29 CFR 408.15416(2)
Other-than-serious$0$0Jul 27, 2016Final
Citation 3, item 8
29 CFR 1910.1200(e)(1)(i) · Hazard communication
Other-than-serious$0$0Jul 27, 2016Final
Citation 4, item 1
29 CFR 408.10835(2)
Repeat$400$200Jul 27, 2016Final
Citation 4, item 2
29 CFR 408.12154(1)
Repeat$400$200Jul 27, 2016Final
Citation 4, item 3
29 CFR 408.14007(4)
Repeat$400$200Jul 27, 2016Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(e)(1)(i)

(i) A list of the hazardous chemicals known to be present using a product identifier that is referenced on the appropriate safety data sheet (the list may be compiled for the workplace as a whole or for individual work areas); and,

29 CFR 1910.146 · Permit-required confined spaces

29 CFR 1910.146(c)(1)

(c) General requirements. (1) The employer shall evaluate the workplace to determine if any spaces are permit- required confined spaces.

29 CFR 1910.146(c)(2)

(2) If the workplace contains permit spaces, the employer shall inform exposed employees, by posting danger signs or by any other equally effective means, of the existence and location of and the danger posed by the permit spaces.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.304 · Grounding and circuit protection

29 CFR 1910.305 · Electrical wiring methods

Other other automotive mechanical and electrical repair and maintenance employers in Michigan

Alert subscribers get notified of each newly cited employer in Michigan the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.