OSHA SearchOSHA records by employer

Dickson Building LLC: OSHA inspections and violations

Bend, Oregon · Framing Contractors · NAICS 238130

3inspections
6citation items
$2,506current penalties
Dec 19, 2024last inspection

Dickson Building LLC has 3 OSHA inspections on record in Oregon, the first in 2013.

OSHA's last visit started on Dec 19, 2024 as a planned inspection, in Bend, and the case has not closed yet.

Across those inspections OSHA issued 6 citation items: 4 serious and 2 other-than-serious.

OSHA proposed $2,506 in penalties and the amount has not been reduced.

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Dickson Building LLC averages $2,306 over 1 cited inspection in that time.

Dickson Building LLC: OSHA citation items per year, 2013 to 2024
Citation items per year, by inspection date.

Oregon · latest 90 days of OSHA records

384employers cited

2 of them in the same industry

Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Oregon

Checking a subcontractor, a client or your own company? Watch Dickson Building LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347945149 OPENED DEC 19, 2024Open

Planned · Partial · Safety · 2 employees at the site · Open

17839 Preservation Loop, Bend, OR 97707 · New Single-Family Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-003-1501(1)
Serious$1,153$1,153Jan 17, 2025Final
Citation 1, item 2
29 CFR 1926.1053(b)(1) · Ladders in construction
Serious$1,153$1,153Jan 17, 2025Final
Citation 2, item 3
29 CFR OAR 437-001-0765(13)-1
Other-than-serious$0$0Jan 17, 2025Final

Inspection 317104693 OPENED AUG 26, 2014Closed

Planned · Partial · Safety · 3 employees at the site · Closed Sep 11, 2014

3443 Nw Greenleaf Way, Bend, OR 97701 · Framing Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 315929950 OPENED JAN 31, 2013Closed

Planned · Complete · Safety · 2 employees at the site · Closed Feb 18, 2014

3136 Nw Starview Dr, Bend, OR 97701 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$100$100Apr 12, 2013Closed
Citation 1, item 2
29 CFR 1926.304(i)(1) · Woodworking tools
Serious$100$100Apr 12, 2013Closed
Citation 2, item 3
29 CFR 1926.405(g)(2)(iv) · Job-site wiring
Other-than-serious$0$0Apr 12, 2013Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1053 · Ladders in construction

29 CFR 1926.1053(b)(1)

(1) When portable ladders are used for access to an upper landing surface, the ladder side rails shall extend at least 3 feet (.9 m) above the upper landing surface to which the ladder is used to gain access; or, when such an extension is not possible because of the ladder's length, then the ladder shall be secured at its top to a rigid support that will not deflect, and a grasping device, such as a grabrail, shall be provided to assist employees in mounting and dismounting the ladder. In no case shall the extension be such that ladder deflection under a load would, by itself, cause the ladder to slip off its support.

29 CFR 1926.304 · Woodworking tools

29 CFR 1926.304(i)(1)

(i) Hand-fed ripsaws. (1) Each circular hand-fed ripsaw shall be guarded by a hood which shall completely enclose that portion of the saw above the table and that portion of the saw above the material being cut. The hood and mounting shall be arranged so that the hood will automatically adjust itself to the thickness of and remain in contact with the material being cut but it shall not offer any considerable resistance to insertion of material to saw or to passage of the material being sawed. The hood shall be made of adequate strength to resist blows and strains incidental to reasonable operation, adjusting, and handling, and shall be so designed as to protect the operator from flying splinters and broken saw teeth. It shall be made of material that is soft enough so that it will be unlikely to cause tooth breakage. The hood shall be so mounted as to insure that its operation will be po

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(g)(2)(iv)

(iv) Strain relief. Flexible cords shall be connected to devices and fittings so that strain relief is provided which will prevent pull from being directly transmitted to joints or terminal screws.

29 CFR 7031.5010

Other framing contractors employers in Oregon

Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.