OSHA SearchOSHA records by employer

Dickson - Dickson Electric System: OSHA inspections and violations

Dickson, Tennessee · Electric Power Distribution · NAICS 221122

2inspections
2citation items
$0current penalties
Aug 28, 2017last inspection

Dickson - Dickson Electric System has 2 OSHA inspections on record in Tennessee, the first in 2016.

OSHA's last visit started on Aug 28, 2017, in White Bluff.

Across those inspections OSHA issued 2 citation items: 2 serious.

OSHA did not attach a penalty to any of these citations.

For context, across all utility employers the median penalty per cited inspection since 2015 is $0. Dickson - Dickson Electric System averages $0 over 2 cited inspections in that time.

Dickson - Dickson Electric System: OSHA citation items per year, 2016 to 2017
Citation items per year, by inspection date.

Tennessee · latest 90 days of OSHA records

344employers cited

Get notified the morning OSHA posts each new citation in Tennessee: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Tennessee

Checking a subcontractor, a client or your own company? Watch Dickson - Dickson Electric System and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342624889 OPENED AUG 28, 2017Closed

Unprogrammed other · Complete · Safety · Local government · 3 employees at the site · Closed Oct 11, 2017

1111 Old Charlotte Road, White Bluff, TN 37187 · Power and Communication Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.147(c)(1) · Lockout/tagout
Serious$0$0Sep 12, 2017Final

Inspection 341429819 OPENED APR 22, 2016Closed

Planned · Complete · Safety · Local government · 75 employees at the site · Closed Jun 16, 2016

236 Cowan Road, Dickson, TN 37055 · Electric Power Distribution · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods
Serious$0$0May 13, 2016Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(1)

(c) General—(1) Energy control program. The employer shall establish a program consisting of energy control procedures, employee training and periodic inspections to ensure that before any employee performs any servicing or maintenance on a machine or equipment where the unexpected energizing, start up or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source, and rendered inoperative.

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.305(g)(2)(iii)

(iii) Flexible cords and cables shall be connected to devices and fittings so that strain relief is provided that will prevent pull from being directly transmitted to joints or terminal screws.

Other electric power distribution employers in Tennessee

Alert subscribers get notified of each newly cited employer in Tennessee the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.