OSHA SearchOSHA records by employer

Division 4 of NC LLC: OSHA inspections and violations

Rock Hill, South Carolina · Masonry Contractors · NAICS 238140

1inspections
3citation items
$700current penalties
Jan 20, 2015last inspection

Division 4 of NC LLC has one OSHA inspection on record in South Carolina.

OSHA opened it on Jan 20, 2015 as a planned inspection, in Rock Hill.

From that inspection OSHA issued 3 citation items: 3 serious.

OSHA proposed $700 in penalties and the amount has not been reduced.

Most often, OSHA cited 1926.451, scaffolds, general requirements (2 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Division 4 of NC LLC averages $700 over 1 cited inspection in that time.

Division 4 of NC LLC: OSHA citation items per year, 2015 to 2015
Citation items per year, by inspection date.

South Carolina · latest 90 days of OSHA records

45employers cited

Get notified the morning OSHA posts each new citation in South Carolina: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in South Carolina

Checking a subcontractor, a client or your own company? Watch Division 4 of NC LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 317889913 OPENED JAN 20, 2015Closed

Planned · Complete · Safety · 6 employees at the site · Closed May 7, 2015

596 Harrons Park Rd, Rock Hill, SC 29730 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.300(b)(2) · Tools—Hand and Power: general requirements
Serious$225$225Feb 4, 2015Closed
Citation 1, item 2
29 CFR 1926.451(g)(4)(iv) · Scaffolds, general requirements
Serious$375$375Feb 4, 2015Closed
Citation 1, item 3
29 CFR 1926.451(h)(2) · Scaffolds, general requirements
Serious$100$100Feb 4, 2015Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.300 · Tools—Hand and Power: general requirements

29 CFR 1926.300(b)(2)

(2) Belts, gears, shafts, pulleys, sprockets, spindles, drums, fly wheels, chains, or other reciprocating, rotating or moving parts of equipment shall be guarded if such parts are exposed to contact by employees or otherwise create a hazard. Guarding shall meet the requirements as set forth in American National Standards Institute, B15.1-1953 (R1958), Safety Code for Mechanical Power-Transmission Apparatus.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(g)(4)(iv)

(iv) When midrails are used, they shall be installed at a height approximately midway between the top edge of the guardrail system and the platform surface.

29 CFR 1926.451(h)(2)

(2) Where there is a danger of tools, materials, or equipment falling from a scaffold and striking employees below, the following provisions apply:

Other masonry contractors employers in South Carolina

Alert subscribers get notified of each newly cited employer in South Carolina the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.