OSHA SearchOSHA records by employer

Dixie Land Energy, LLC: OSHA inspections and violations

North East, Maryland · Plumbing, Heating, and Air-Conditioning Contractors · NAICS 238220

1inspections
4citation items
$1,250current penalties
Jan 21, 2022last inspection

Dixie Land Energy, LLC has one OSHA inspection on record in Maryland.

OSHA opened it on Jan 21, 2022 as a planned inspection, in North East.

From that inspection OSHA issued 4 citation items: 2 serious and 2 other-than-serious.

OSHA proposed $1,250 in penalties and the amount has not been reduced.

Most often, OSHA cited 1926.651, excavations (3 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Dixie Land Energy, LLC averages $1,250 over 1 cited inspection in that time.

Dixie Land Energy, LLC: OSHA citation items per year, 2022 to 2022
Citation items per year, by inspection date.

Maryland · latest 90 days of OSHA records

187employers cited

8 of them in the same industry

Get notified the morning OSHA posts each new citation in Maryland: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Maryland

Checking a subcontractor, a client or your own company? Watch Dixie Land Energy, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 345740070 OPENED JAN 21, 2022Closed

Planned · Complete · Safety · 1 employee at the site · Closed Mar 25, 2022

106 Saratoga Ct, North East, MD 21901 · Plumbing, Heating, and Air-Conditioning Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.651(k)(1) · Excavations
Serious$1,250$1,250Feb 23, 2022Final
Citation 1, item 1b
29 CFR 1926.651(j)(2) · Excavations
Serious$0$0Feb 23, 2022Final
Citation 2, item 1
29 CFR 1926.651(b)(1) · Excavations
Other-than-serious$0$0Feb 23, 2022Final
Citation 2, item 2
29 CFR 1926.1051(a) · Stairways and Ladders: general requirements
Other-than-serious$0$0Feb 23, 2022Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1051 · Stairways and Ladders: general requirements

29 CFR 1926.1051(a)

(a) A stairway or ladder shall be provided at all personnel points of access where there is a break in elevation of 19 inches (48 cm) or more, and no ramp, runway, sloped embankment, or personnel hoist is provided.

29 CFR 1926.651 · Excavations

29 CFR 1926.651(b)(1)

(b) Underground installations. (1) The estimated location of utility installations, such as sewer, telephone, fuel, electric, water lines, or any other underground installations that reasonably may be expected to be encountered during excavation work, shall be determined prior to opening an excavation.

29 CFR 1926.651(j)(2)

(2) Employees shall be protected from excavated or other materials or equipment that could pose a hazard by falling or rolling into excavations. Protection shall be provided by placing and keeping such materials or equipment at least 2 feet (.61 m) from the edge of excavations, or by the use of retaining devices that are sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary.

Other plumbing, heating, and air-conditioning contractors employers in Maryland

Alert subscribers get notified of each newly cited employer in Maryland the morning it is posted. See the alert plans.