OSHA SearchOSHA records by employer

Do-Right Plastering, Inc.: OSHA inspections and violations

Groveland, Florida · Drywall and Insulation Contractors · NAICS 238310

2inspections
5citation items
$7,450current penalties
Jun 12, 2015last inspection

OSHA has inspected Do-Right Plastering, Inc. 2 times in Florida since 2010.

The latest one began on Jun 12, 2015 as a planned inspection, in Gainesville.

Those inspections ended with 5 citation items: 5 serious.

Penalties were first proposed at $7,450 and still stand at $7,450.

Scaffolds, general requirements comes up most often in these citations: 4 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,079, and Do-Right Plastering, Inc. averages $4,900 (1 cited inspection).

Do-Right Plastering, Inc.: OSHA citation items per year, 2010 to 2015
Citation items per year, by inspection date.

Want to know if OSHA cites Do-Right Plastering, Inc. again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 340720382 OPENED JUN 12, 2015Closed

Planned · Partial · Safety · 2 employees at the site · Closed Aug 27, 2019

2029 Nw 13th Street, Gainesville, FL 32601 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.453(b)(2)(v) · Aerial lifts
Serious$4,900$4,900Jul 17, 2015Final

Inspection 314843400 OPENED AUG 17, 2010Closed

Planned · Partial · Safety · 9 employees at the site · Closed May 3, 2012

14627 Country Road, Groveland, FL 34736 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$600$600Sep 7, 2010Closed
Citation 1, item 2
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$600$600Sep 7, 2010Closed
Citation 1, item 3
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$600$600Sep 7, 2010Closed
Citation 1, item 4
29 CFR 1926.451(f)(7) · Scaffolds, general requirements
Serious$750$750Sep 7, 2010Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(c)(2)

(2) Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation.

29 CFR 1926.451(e)(1)

(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.

29 CFR 1926.453 · Aerial lifts

Other drywall and insulation contractors employers in Florida

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.