OSHA SearchOSHA records by employer

Drewry Restorations LLC: OSHA inspections and violations

Kaukauna, Wisconsin · Painting and Wall Covering Contractors · NAICS 238320

1inspections
4citation items
$3,531current penalties
Apr 4, 2017last inspection

OSHA inspectors have visited Drewry Restorations LLC in Wisconsin one time.

It opened on Apr 4, 2017 as a planned inspection, in Kaukauna.

In all, OSHA issued 4 citation items: 4 serious.

The proposed penalties came to $7,062; today they stand at $3,531, 50% less.

The rule cited most here is 1926.451 (scaffolds, general requirements), 3 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Drewry Restorations LLC averages $3,531 across 1 cited inspection.

Drewry Restorations LLC: OSHA citation items per year, 2017 to 2017
Citation items per year, by inspection date.

Wisconsin · latest 90 days of OSHA records

229employers cited

Get notified the morning OSHA posts each new citation in Wisconsin: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Wisconsin

Checking a subcontractor, a client or your own company? Watch Drewry Restorations LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342223450 OPENED APR 4, 2017Closed

Planned · Partial · Safety · 1 employee at the site · Closed Sep 18, 2017

309 Desnoyer Street, Kaukauna, WI 54130 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(b)(1)(i) · Scaffolds, general requirements
Serious$3,803$1,902May 23, 2017Final
Citation 1, item 1b
29 CFR 1926.451(g)(1)(vii) · Scaffolds, general requirements
Serious$0$0May 23, 2017Final
Citation 1, item 2a
29 CFR 1926.451(f)(7) · Scaffolds, general requirements
Serious$3,259$1,630May 23, 2017Final
Citation 1, item 2b
29 CFR 1926.454(c)(2) · Scaffold training
Serious$0$0May 23, 2017Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)(i)

(i) Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) shall be installed so that the space between adjacent units and the space between the platform and the uprights is no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary (for example, to fit around uprights when side brackets are used to extend the width of the platform).

29 CFR 1926.451(f)(7)

(7) Scaffolds shall be erected, moved, dismantled, or altered only under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration. Such activities shall be performed only by experienced and trained employees selected for such work by the competent person.

29 CFR 1926.451(g)(1)(vii)

(vii) For all scaffolds not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee shall be protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.

29 CFR 1926.454 · Scaffold training

Other painting and wall covering contractors employers in Wisconsin

Alert subscribers get notified of each newly cited employer in Wisconsin the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.