OSHA SearchOSHA records by employer

Duke Energy Florida, LLC: OSHA inspections and violations

Bartow, Florida · Electric Power Distribution · NAICS 221122

8inspections
8citation items
$55,035current penalties
Feb 22, 2024last inspection

Duke Energy Florida, LLC has 8 OSHA inspections on record in Florida, the first in 2013.

OSHA's last visit started on Feb 22, 2024 on a referral, in Saint Petersburg.

Across those inspections OSHA issued 8 citation items: 7 serious and 1 other-than-serious.

OSHA proposed $99,488 in penalties. After settlements and reviews the total is $55,035, down 45%.

Most often, OSHA cited 1910.269, electric power generation, transmission, and distribution (6 items).

For context, across all utility employers the median penalty per cited inspection since 2015 is $0. Duke Energy Florida, LLC averages $10,018 over 2 cited inspections in that time.

1 inspection on this page followed a fatal incident.

It reported 4 severe injuries to OSHA since 2015.

Duke Energy Florida, LLC: OSHA citation items per year, 2013 to 2024
Citation items per year, by inspection date.

Florida · latest 90 days of OSHA records

318employers cited

Get notified the morning OSHA posts each new citation in Florida: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Florida

Checking a subcontractor, a client or your own company? Watch Duke Energy Florida, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347292278 OPENED FEB 22, 2024Closed

Referral · Partial · Safety · 30,000 employees at the site · Closed Mar 29, 2024

2725 Scherer Way North, Saint Petersburg, FL 33716 · Electric Power Distribution · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 347157620 OPENED DEC 12, 2023Closed

Referral · Partial · Safety · 19 employees at the site · Closed Mar 7, 2024

1302 Picketts Landing Court, Carrabelle, FL 32322 · Electric Power Distribution · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 347034837 OPENED OCT 16, 2023Closed

Planned · No inspection · Safety · Closed Oct 17, 2023

28203 Naw 174th Avenue, High Springs, FL 32643 · Solar Electric Power Generation · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 347013203 OPENED OCT 5, 2023Closed

Referral · Partial · Safety · 27,600 employees at the site · Closed Jan 23, 2024

13303 Sullivan Road Camp Lake Substation, Clermont, FL 34715 · Electric Power Distribution · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1b
29 CFR 1910.269(n)(2) · Electric power generation, transmission, and distribution
Serious$0$10,547Dec 1, 2023Final

Inspection 346771850 OPENED JUN 13, 2023Closed

Referral · Partial · Safety · 22 employees at the site · Closed Jan 12, 2024

2927 W. International Drive, Kissimmee, FL 34746 · Power and Communication Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.416(a)(1) · Electrical safety in construction
Serious$9,488$9,488Dec 6, 2023Final

Inspection 346761323 OPENED JUN 9, 2023Closed

Complaint · Partial · Safety · 5 employees at the site · Closed Jun 20, 2023

6695 N County Rd 663, Bowling Green, FL 33834 · Electric Power Distribution · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 340030428 OPENED OCT 21, 2014Closed

Fatality or catastrophe · Complete · Safety · 6 employees at the site · Closed Oct 15, 2015

4940 Cr 316, Reddick, FL 32686 · Electric Bulk Power Transmission and Control · OSHA's record · Phone and website on Google Maps

Incident on Oct 23, 2014 (fatal): Employee contacts live conductors during testing and is elec

At 7:00 a.m. on October 23, 2014, an employee placed test leads on the high and low side transformer bushing for DOBLE testing. The DOBLE testing device energized the test leads and the transformer bushing contacts while the employee was on top of the transformer. The employee was within the minimum approach distance of the live conductors. The conductors were energized by 10kV and 300mA. The employee's hand contacted a high side bushing contact plate on the transformer without an insulated glove and the employee was electrocuted. electrocuted.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.22(a)(1) · General requirements
Serious$3,000$7,000Apr 10, 2015Final
Citation 1, item 2
29 CFR 1910.269(o)(2)(ii) · Electric power generation, transmission, and distribution
Serious$7,000$7,000Apr 10, 2015Final
Citation 1, item 3
29 CFR 1910.269(o)(4)(v) · Electric power generation, transmission, and distribution
Serious$3,000$7,000Apr 10, 2015Final
Citation 1, item 4
29 CFR 1910.269(o)(6)(ii) · Electric power generation, transmission, and distribution
Serious$7,000$7,000Apr 10, 2015Final
Citation 1, item 5
29 CFR 1910.269(o)(5)(iv) · Electric power generation, transmission, and distribution
Serious$70,000$7,000Apr 10, 2015Final
Citation 3, item 1
29 CFR 1910.269(o)(3)(iv) · Electric power generation, transmission, and distribution
Other-than-serious$0$0Apr 10, 2015Final

Inspection 339520835 OPENED DEC 13, 2013Closed

Planned · Complete · Safety · 30 employees at the site · Closed Jan 15, 2014

7700 County Road 555 S, Bartow, FL 33830 · Fossil Fuel Electric Power Generation · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Severe injury reports

Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 4 reports on file.

Feb 16, 2024, Saint Petersburg: Hospitalization · electrical burns any degree · head and neck

An employee was de-energizing a stand-alone three-phase 3,000-kVA transformer. The employee had opened a bay on the switchgear and removed the barrier board covering a 200-amp switch. The employee then used a 6-foot insulated work stick to open the fuse door. As soon as the top of the fuse door separated from the gear's switch bracket, an arc flash occurred, burning the employee's left ear, neck,…

Dec 6, 2023, Carrabelle: Hospitalization · second degree electrical burns · face, unspecified

On December 6, 2023, an employee of Duke Energy was working on a single-phase 120-/240-volt parallel service re-tap when a secondary flash occurred in an underground service. The employee suffered a second-degree burn to the face and was hospitalized.

Sep 19, 2023, Clermont: Hospitalization · third or fourth degree electrical burns · multiple body parts, n.e.c.

An employee was changing out insulators and hardware on a lattice 230-kilovolt tower when he saw that the pin that was securing the V-string to the outside phase was falling out. He hooked up a chain hoist to stop it. While going down, the employee dropped the chain hoist, causing it to go by a 69-kilovolt line. He suffered an electric shock by induction, which resulted in third-degree burns on…

Mar 7, 2023, Bowling Green: Hospitalization · second degree electrical burns · head and neck

An employee was working on a transformer, removing the cover inside a cabinet, when an arc flash occurred. The employee sustained second-degree burns to his neck and ears requiring hospitalization.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.22 · General requirements

29 CFR 1910.269 · Electric power generation, transmission, and distribution

29 CFR 1910.269(n)(2)

(2) General. For any employee to work transmission and distribution lines or equipment as deenergized, the employer shall ensure that the lines or equipment are deenergized under the provisions of paragraph (m) of this section and shall ensure proper grounding of the lines or equipment as specified in paragraphs (n)(3) through (n)(8) of this section. However, if the employer can demonstrate that installation of a ground is impracticable or that the conditions resulting from the installation of a ground would present greater hazards to employees than working without grounds, the lines and equipment may be treated as deenergized provided that the employer establishes that all of the following conditions apply:

29 CFR 1910.269(o)(2)(ii)

(ii) The employer shall ensure that each employee, upon initial assignment to the test area, receives training in safe work practices, with retraining provided as required by paragraph (a)(2) of this section.

29 CFR 1910.269(o)(3)(iv)

(iv) The employer shall ensure the removal of the safeguards required by paragraph (o)(3)(iii) of this section when employees no longer need the protection afforded by the safeguards.

29 CFR 1926.416 · Electrical safety in construction

Other electric power distribution employers in Florida

Alert subscribers get notified of each newly cited employer in Florida the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.