OSHA SearchOSHA records by employer

E.R.H. Enterprises, Inc.: OSHA inspections and violations

Watseka, Illinois · Site Preparation Contractors · NAICS 238910

2inspections
16citation items
$44,000current penalties
Jun 22, 2016last inspection

Since 2009, OSHA inspectors have visited E.R.H. Enterprises, Inc. in Illinois 2 times.

The most recent inspection opened on Jun 22, 2016 after a complaint, in Danville.

In all, OSHA issued 16 citation items: 16 serious.

The proposed penalties came to $67,118; today they stand at $44,000, 34% less.

The rule cited most here is 1910.305 (electrical wiring methods), 5 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. E.R.H. Enterprises, Inc. averages $39,000 across 1 cited inspection.

E.R.H. Enterprises, Inc.: OSHA citation items per year, 2009 to 2016
Citation items per year, by inspection date.

Illinois · latest 90 days of OSHA records

428employers cited

5 of them in the same industry

Get notified the morning OSHA posts each new citation in Illinois: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Illinois

Checking a subcontractor, a client or your own company? Watch E.R.H. Enterprises, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341575439 OPENED JUN 22, 2016Closed

Complaint · Partial · Safety · 3 employees at the site · Closed Nov 13, 2017

1 W. Hegeler Lane, Danville, IL 61832 · Sewage Treatment Facilities · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.219(c)(2)(i) · Belts, pulleys and power-transmission parts
Serious$6,236$4,000Oct 7, 2016Final
Citation 1, item 2a
29 CFR 1910.219(d)(1) · Belts, pulleys and power-transmission parts
Serious$6,236$4,000Oct 7, 2016Final
Citation 1, item 2b
29 CFR 1910.219(e)(1)(i) · Belts, pulleys and power-transmission parts
Serious$0$0Oct 7, 2016Final
Citation 1, item 3
29 CFR 1910.303(b)(1)(ii) · Electrical equipment, general requirements
Serious$6,236$4,000Oct 7, 2016Final
Citation 1, item 4
29 CFR 1910.303(b)(1)(iv) · Electrical equipment, general requirements
Serious$6,236$4,000Oct 7, 2016Final
Citation 1, item 5
29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods
Serious$6,236$4,000Oct 7, 2016Final
Citation 1, item 6
29 CFR 1910.305(d)(2) · Electrical wiring methods
Serious$8,730$7,000Oct 7, 2016Final
Citation 1, item 7
29 CFR 1910.305(g)(1)(iv)(a) · Electrical wiring methods
Serious$6,236$4,000Oct 7, 2016Final
Citation 1, item 8
29 CFR 1910.305(g)(1)(iv)(b) · Electrical wiring methods
Serious$6,236$4,000Oct 7, 2016Final
Citation 1, item 9
29 CFR 1910.305(g)(1)(iv)(c) · Electrical wiring methods
Serious$6,236$4,000Oct 7, 2016Final

Inspection 312885668 OPENED MAR 16, 2009Closed

Complaint · Partial · Safety · 4 employees at the site · Closed Feb 19, 2010

Market & Newell, Watseka, IL 60970 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.100(a) · Hard hats in construction
Serious$1,750$1,000Apr 1, 2009Closed
Citation 1, item 1b
29 CFR 1926.651(j)(2) · Excavations
Serious$0$0Apr 1, 2009Closed
Citation 1, item 2
29 CFR 1926.651(d) · Excavations
Serious$1,750$1,000Apr 1, 2009Closed
Citation 1, item 3
29 CFR 1926.651(h)(1) · Excavations
Serious$2,500$1,500Apr 1, 2009Closed
Citation 1, item 4a
29 CFR 1926.651(k)(1) · Excavations
Serious$2,500$1,500Apr 1, 2009Closed
Citation 1, item 4b
29 CFR 1926.652(a)(1) · Trench protection
Serious$0$0Apr 1, 2009Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.219 · Belts, pulleys and power-transmission parts

29 CFR 1910.219(c)(2)(i)

(2) Guarding horizontal shafting. (i) All exposed parts of horizontal shafting seven (7) feet or less from floor or working platform, excepting runways used exclusively for oiling, or running adjustments, shall be protected by a stationary casing enclosing shafting completely or by a trough enclosing sides and top or sides and bottom of shafting as location requires.

29 CFR 1910.219(d)(1)

(d) Pulleys—(1) Guarding. Pulleys, any parts of which are seven (7) feet or less from the floor or working platform, shall be guarded in accordance with the standards specified in paragraphs (m) and (o) of this section. Pulleys serving as balance wheels (e.g., punch presses) on which the point of contact between belt and pulley is more than six feet six inches (6 ft. 6 in.) from the floor or platform may be guarded with a disk covering the spokes.

29 CFR 1910.219(e)(1)(i)

(e) Belt, rope, and chain drives—(1) Horizontal belts and ropes. (i) Where both runs of horizontal belts are seven (7) feet or less from the floor level, the guard shall extend to at least fifteen (15) inches above the belt or to a standard height except that where both runs of a horizontal belt are 42 inches or less from the floor, the belt shall be fully enclosed in accordance with paragraphs (m) and (o) of this section.

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1926.100 · Hard hats in construction

29 CFR 1926.651 · Excavations

29 CFR 1926.652 · Trench protection

Other site preparation contractors employers in Illinois

Alert subscribers get notified of each newly cited employer in Illinois the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.