OSHA SearchOSHA records by employer

Edwin Moncada: OSHA inspections and violations

Madison, Mississippi · Masonry Contractors · NAICS 238140

1inspections
4citation items
$8,400current penalties
Mar 26, 2015last inspection

OSHA has inspected Edwin Moncada once in Mississippi.

The inspection began on Mar 26, 2015 as a planned inspection, in Madison.

That inspection ended with 4 citation items: 4 serious.

Penalties were first proposed at $8,400 and still stand at $8,400.

Scaffolds, general requirements comes up most often in these citations: 4 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,078, and Edwin Moncada averages $8,400 (1 cited inspection).

Edwin Moncada: OSHA citation items per year, 2015 to 2015
Citation items per year, by inspection date.

Want to know if OSHA cites Edwin Moncada again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 340493022 OPENED MAR 26, 2015Closed

Planned · Partial · Safety · 5 employees at the site · Closed Apr 10, 2018

177 Ironwood Plantation Blvd, Madison, MS 39110 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$2,000$2,000Jun 5, 2015Final
Citation 1, item 2
29 CFR 1926.451(b)(5)(i) · Scaffolds, general requirements
Serious$2,000$2,000Jun 5, 2015Final
Citation 1, item 3
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$1,600$1,600Jun 5, 2015Final
Citation 1, item 4
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$2,800$2,800Jun 5, 2015Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(b)(5)(i)

(5)(i) Each end of a platform 10 feet or less in length shall not extend over its support more than 12 inches (30 cm) unless the platform is designed and installed so that the cantilevered portion of the platform is able to support employees and/or materials without tipping, or has guardrails which block employee access to the cantilevered end.

29 CFR 1926.451(e)(1)

(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.

Other masonry contractors employers in Mississippi

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.