OSHA SearchOSHA records by employer

Ellis Island Design, Inc.: OSHA inspections and violations

New York, New York · Commercial and Institutional Building Construction · NAICS 236220

1inspections
4citation items
$4,600current penalties
Aug 29, 2018last inspection

Ellis Island Design, Inc. has one OSHA inspection on record in New York.

OSHA opened it on Aug 29, 2018 after a complaint, in New York.

From that inspection OSHA issued 4 citation items: 4 serious.

OSHA proposed $9,424 in penalties. After settlements and reviews the total is $4,600, down 51%.

Most often, OSHA cited 1926.403, electrical equipment on job sites (2 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Ellis Island Design, Inc. averages $4,600 over 1 cited inspection in that time.

Ellis Island Design, Inc.: OSHA citation items per year, 2018 to 2018
Citation items per year, by inspection date.

New York · latest 90 days of OSHA records

360employers cited

13 of them in the same industry

Get notified the morning OSHA posts each new citation in New York: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in New York

Checking a subcontractor, a client or your own company? Watch Ellis Island Design, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343425740 OPENED AUG 29, 2018Closed

Complaint · Partial · Safety · 3 employees at the site · Closed May 16, 2019

87 Ludlow Street, New York, NY 10003 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.403(b)(2) · Electrical equipment on job sites
Serious$2,217$2,050Jan 18, 2019Final
Citation 1, item 1b
29 CFR 1926.404(f)(6) · Ground-fault protection on job sites
Serious$2,772$0Jan 18, 2019Final
Citation 1, item 2
29 CFR 1926.403(i)(2)(i) · Electrical equipment on job sites
Serious$2,772$1,550Jan 18, 2019Final
Citation 1, item 4
29 CFR 1926.405(b)(2) · Job-site wiring
Serious$1,663$1,000Jan 18, 2019Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(b)(2)

(2) Installation and use. Listed, labeled, or certified equipment shall be installed and used in accordance with instructions included in the listing, labeling, or certification.

29 CFR 1926.403(i)(2)(i)

(2) Guarding of live parts. (i) Except as required or permitted elsewhere in this subpart, live parts of electric equipment operating at 50 volts or more shall be guarded against accidental contact by cabinets or other forms of enclosures, or by any of the following means:

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.404(f)(6)

(6) Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent and continuous.

29 CFR 1926.405 · Job-site wiring

Other commercial and institutional building construction employers in New York

Alert subscribers get notified of each newly cited employer in New York the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.