Emory Electric, LLC: OSHA inspections and violations
Asheville, North Carolina · Electrical Contractors and Other Wiring Installation Contractors · NAICS 238210
24inspections
32citation items
$11,855current penalties
Sep 25, 2025last inspection
Since 1986, OSHA inspectors have visited Emory Electric, LLC in North Carolina 24 times.
The most recent inspection opened on Sep 25, 2025 on a referral, in Fletcher.
In all, OSHA issued 32 citation items: 9 serious and 23 other-than-serious.
The proposed penalties came to $15,255; today they stand at $11,855, 22% less.
The rule cited most here is 1926.500 (scope, application, and definitions applicable to this subpart), 6 times.
Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Emory Electric, LLC averages $6,950 across 1 cited inspection.
Emory Electric, LLC also files yearly injury logs with OSHA, summarized below.
Citation items per year, by inspection date.
North Carolina · latest 90 days of OSHA records
230employers cited
2 of them in the same industry
Get notified the morning OSHA posts each new citation in North Carolina: the employer, the site address, the rules broken and the penalty.
Accident · Partial · Safety · 6 employees at the site · Closed Feb 6, 2009
96 University Way - New Residence Hall Building B, Cullowhee, NC 28723 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps
Incident on Aug 26, 2008: Employee is impaled on rebar in fall
On August 26, 2008, an employee and a coworker of an electrical subcontractor we re cutting holes through a 16-in. thick, poured concrete wall with a core drill. They were working on a fabricated work platform comprised of wooden planking pl aced between two 12-ft, composite stepladders at a height of between 10.5-ft and 11-ft above the floor. The rig for the core drill was supported on a threaded b olt inserted in the wall above the drill site. When the third of four holes was completed, the employee loosened the nut on the support bolt to reposition the c ore drill. The nut came off of the bolt and base plate of the drill rig slid off the bolt. The weight of the drill and drill rig caused the employee to fall bac kwards off of the plank. The employee landed on a piece of exposed, uncapped, Nu mber 6-gauge steel rebar protruding from the wall of a partially-constructed sta ir landing located adjacent to the work platform. The rebar entered the employee 's left side below the arm pit, passed through the upper torso and exited his ri ght side and right arm. The employee was hospitalized and treated for puncture w ound.
From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.
In 2025, the Asheville site logged 5 recordable injuries or illnesses among about 136 workers: 2.8 per 100 full-time workers, against a median of 1.8 for its industry. Those cases cost 60 days away from work.
Site and year
Workers
Cases
Days-away cases
Rate
Industry median
Emory Electric, LLC.
Asheville · 2025
136
5
5
2.8
1.8
Emory Electric, LLC
Asheville · 2024
120
3
0
2.6
1.8
Emory Electric, Inc.
Asheville · 2019
143
6
0
4.1
1.8
Included with any plan: 1 more yearly log from these sites, back to 2019, with each site's average rate over its latest three years. Already a subscriber? Sign in.
(a) General. (1) The employer shall ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation.
(1) Except during stairway construction, foot traffic is prohibited on stairways with pan stairs where the treads and/or landings are to be filled in with concrete or other material at a later date, unless the stairs are temporarily fitted with wood or other solid material at least to the top edge of each pan. Such temporary treads and landings shall be replaced when worn below the level of the top edge of the pan.
29 CFR 1926.1052(c)(1)
(1) Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, shall be equipped with:
Alert subscribers get notified of each newly cited employer in North Carolina the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.