OSHA SearchOSHA records by employer

Engineered Construction LLC: OSHA inspections and violations

Twinsburg, Ohio · Poured Concrete Foundation and Structure Contractors · NAICS 238110

3inspections
5citation items
$19,427current penalties
Jan 6, 2026last inspection

Since 2017, OSHA inspectors have visited Engineered Construction LLC in Ohio 3 times.

The most recent inspection opened on Jan 6, 2026 as a planned inspection, in Strongsville and is still open.

In all, OSHA issued 5 citation items: 4 serious and 1 repeat.

The proposed penalties came to $31,529; today they stand at $19,427, 38% less.

The rule cited most here is 1926.651 (excavations), 2 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,078 penalty. Engineered Construction LLC averages $6,476 across 3 cited inspections.

Engineered Construction LLC: OSHA citation items per year, 2017 to 2026
Citation items per year, by inspection date.

Want to know if OSHA cites Engineered Construction LLC again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 348668443 OPENED JAN 6, 2026Open

Planned · Partial · Safety · 5 employees at the site · Open

21075 Cedar Creek Drive, Strongsville, OH 44136 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.652(a)(1) · Trench protection
Serious$4,965$2,979Jan 28, 2026Final
Citation 2, item 1
29 CFR 1926.651(c)(2) · Excavations
Repeat$9,930$5,958Jan 28, 2026Final

Inspection 345186167 OPENED MAR 9, 2021Closed

Planned · Partial · Safety · 40 employees at the site · Closed Apr 11, 2022

7821 Hunting Lake Dr., Concord Township, OH 44024 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.100(a) · Hard hats in construction
Serious$6,827$3,414Mar 22, 2021Final
Citation 1, item 2
29 CFR 1926.651(c)(2) · Excavations
Serious$5,461$2,730Mar 22, 2021Final

Inspection 342760535 OPENED NOV 8, 2017Closed

Planned · Complete · Safety · 20 employees at the site · Closed Jan 10, 2023

Spring Ridge Drive, Twinsburg, OH 44087 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(1) · Fall protection in construction
Serious$4,346$4,346Dec 29, 2017Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.100 · Hard hats in construction

29 CFR 1926.100(a)

(a) Employees working in areas where there is a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, shall be protected by protective helmets.

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.501(b)(1)

(b)(1) Unprotected sides and edges. Each employee on a walking/working surface (horizontal and vertical surface) with an unprotected side or edge which is 6 feet (1.8 m) or more above a lower level shall be protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems.

29 CFR 1926.651 · Excavations

29 CFR 1926.651(c)(2)

(2) Means of egress from trench excavations. A stairway, ladder, ramp or other safe means of egress shall be located in trench excavations that are 4 feet (1.22 m) or more in depth so as to require no more than 25 feet (7.62 m) of lateral travel for employees.

29 CFR 1926.652 · Trench protection

Other poured concrete foundation and structure contractors employers in Ohio

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.