OSHA SearchOSHA records by employer

EP Acquisition Inc dba H-B Elevators: OSHA inspections and violations

Minneapolis, Minnesota · Elevator and Moving Stairway Manufacturing · NAICS 333921

3inspections
11citation items
$4,725current penalties
Jun 18, 2024last inspection

OSHA has inspected EP Acquisition Inc dba H-B Elevators 3 times in Minnesota since 2018.

The latest one began on Jun 18, 2024 as a planned inspection, in Minneapolis.

Those inspections ended with 11 citation items: 8 serious and 3 other-than-serious.

Penalties were first proposed at $6,750 and now stand at $4,725, 30% lower after settlements or reviews.

Lockout/tagout comes up most often in these citations: 3 items under 1910.147.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and EP Acquisition Inc dba H-B Elevators averages $2,362 (2 cited inspections).

EP Acquisition Inc dba H-B Elevators: OSHA citation items per year, 2018 to 2024
Citation items per year, by inspection date.

Minnesota · latest 90 days of OSHA records

373employers cited

Get notified the morning OSHA posts each new citation in Minnesota: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Minnesota

Checking a subcontractor, a client or your own company? Watch EP Acquisition Inc dba H-B Elevators and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347569576 OPENED JUN 18, 2024Closed

Planned · Complete · Safety · 29 employees at the site · Closed Sep 24, 2024

3000 Washington Avenue North, Minneapolis, MN 55411 · Elevator and Moving Stairway Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.36(g)(2) · Exit route design
Serious$600$420Aug 13, 2024Final
Citation 1, item 2
29 CFR 1910.134(a)(2) · Respiratory protection
Serious$600$420Aug 13, 2024Final
Citation 1, item 3
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$1,000$700Aug 13, 2024Final
Citation 1, item 4
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Serious$1,000$700Aug 13, 2024Final
Citation 1, item 5
29 CFR 1910.147(c)(7)(i) · Lockout/tagout
Serious$1,000$700Aug 13, 2024Final
Citation 1, item 6
29 CFR 1910.151(c) · First aid and eyewash
Serious$600$420Aug 13, 2024Final
Citation 1, item 7
29 CFR 1910.213(h)(1) · Woodworking machinery
Serious$1,000$700Aug 13, 2024Final
Citation 2, item 1
29 CFR 1910.213(b)(3) · Woodworking machinery
Other-than-serious$200$140Aug 13, 2024Final
Citation 2, item 2
29 CFR 1910.305(g)(1)(iv) · Electrical wiring methods
Other-than-serious$200$140Aug 13, 2024Final
Citation 2, item 3 Other-than-serious$400$280Aug 13, 2024Final

Inspection 345147342 OPENED FEB 11, 2021Closed

Planned · Complete · Safety · 40 employees at the site · Closed Feb 19, 2021

3000 Washington Avenue North, Minneapolis, MN 55411 · Elevator and Moving Stairway Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 343001418 OPENED FEB 22, 2018Closed

Planned · Complete · Safety · 49 employees at the site · Closed Apr 10, 2018

3000 Washington Avenue North, Minneapolis, MN 55411 · Elevator and Moving Stairway Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods
Serious$150$105Mar 22, 2018Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(a)(2)

(2) The CNP system defaults selected for test pressure shall be set at −15 mm of water (-0.58 inches of water) and the modeled inspiratory flow rate shall be 53.8 liters per minute for performing fit tests.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(4)(i)

(4) Energy control procedure. (i) Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section.

29 CFR 1910.147(c)(6)(i)

(6) Periodic inspection. (i) The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed.

29 CFR 1910.151 · First aid and eyewash

29 CFR 1910.213 · Woodworking machinery

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.36 · Exit route design

29 CFR 5205.870

Other elevator and moving stairway manufacturing employers in Minnesota

Alert subscribers get notified of each newly cited employer in Minnesota the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.