Inspection 347208712 OPENED JAN 11, 2024Closed
821 East Main Stret, Stamford, CT 06902 · Siding Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Prospect, Connecticut · Siding Contractors · NAICS 238170
OSHA has inspected EP Construction, LLC 8 times in Connecticut since 2016.
The latest one began on Jan 11, 2024 as part of a related case, in Stamford.
Those inspections ended with 15 citation items: 14 serious and 1 repeat.
Penalties were first proposed at $42,987 and now stand at $31,257, 27% lower after settlements or reviews.
Scaffolds, general requirements comes up most often in these citations: 6 items under 1926.451.
How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,079, and EP Construction, LLC averages $5,210 (6 cited inspections).
Want to know if OSHA cites EP Construction, LLC again? Add it to a watchlist and we will email you the morning the citation shows up.
Watch this company821 East Main Stret, Stamford, CT 06902 · Siding Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
1261 South Main Street, Plantsville, CT 06479 · Siding Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1926.451(c)(1)(iii) · Scaffolds, general requirements |
Serious | $6,250 | $6,250 | Sep 26, 2023 | Final |
| Citation 1, item 2b 29 CFR 1926.452(w)(2) · Rules for each type of scaffold |
Serious | $6,250 | $0 | Sep 26, 2023 | Final |
44 Canterbury Road, Brooklyn, CT 06234 · Siding Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.451(f)(7) · Scaffolds, general requirements |
Serious | $3,218 | $3,218 | Aug 30, 2021 | Final |
2 West Ledge Drive, Norwich, CT 06360 · Roofing Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
15 Lilac Lane, Prospect, CT 06712 · Roofing Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.501(b)(13) · Fall protection in construction |
Repeat | $11,669 | $11,669 | Aug 19, 2019 | Final |
Squire Village, Spencer Street, Manchester, CT 06040 · Siding Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1926.451(f)(7) · Scaffolds, general requirements |
Serious | $2,000 | $1,000 | Jul 28, 2016 | Final |
| Citation 1, item 1b 29 CFR 1926.454(b) · Scaffold training |
Serious | $0 | $0 | Jul 28, 2016 | Final |
| Citation 1, item 2 29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements |
Serious | $2,000 | $1,000 | Jul 28, 2016 | Final |
Lot 239 Cherry Circle, Prospect, CT 06712 · Siding Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.304(i)(1) · Woodworking tools |
Serious | $2,000 | $1,400 | Apr 22, 2016 | Final |
| Citation 1, item 2a 29 CFR 1926.451(f)(7) · Scaffolds, general requirements |
Serious | $2,000 | $1,400 | Apr 22, 2016 | Final |
| Citation 1, item 2b 29 CFR 1926.454(a)(1) · Scaffold training |
Serious | $0 | $0 | Apr 22, 2016 | Final |
| Citation 1, item 3 29 CFR 1926.451(g)(1)(vii) · Scaffolds, general requirements |
Serious | $2,800 | $1,960 | Apr 22, 2016 | Final |
60 Fairty Drive, New Canaan, CT 06840 · Roofing Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1926.501(b)(13) · Fall protection in construction |
Serious | $2,800 | $1,960 | May 11, 2016 | Final |
| Citation 1, item 1b 29 CFR 1926.503(a)(1) · Fall protection training in construction |
Serious | $0 | $0 | May 11, 2016 | Final |
| Citation 1, item 2a 29 CFR 1926.1053(b)(1) · Ladders in construction |
Serious | $2,000 | $1,400 | May 11, 2016 | Final |
| Citation 1, item 2b 29 CFR 1926.1060(a) · Ladder and stairway training |
Serious | $0 | $0 | May 11, 2016 | Final |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1926.1053(b)(1)
(1) When portable ladders are used for access to an upper landing surface, the ladder side rails shall extend at least 3 feet (.9 m) above the upper landing surface to which the ladder is used to gain access; or, when such an extension is not possible because of the ladder's length, then the ladder shall be secured at its top to a rigid support that will not deflect, and a grasping device, such as a grabrail, shall be provided to assist employees in mounting and dismounting the ladder. In no case shall the extension be such that ladder deflection under a load would, by itself, cause the ladder to slip off its support.
29 CFR 1926.1060(a)
(a) The employer shall provide a training program for each employee using ladders and stairways, as necessary. The program shall enable each employee to recognize hazards related to ladders and stairways, and shall train each employee in the procedures to be followed to minimize these hazards.
29 CFR 1926.304(i)(1)
(i) Hand-fed ripsaws. (1) Each circular hand-fed ripsaw shall be guarded by a hood which shall completely enclose that portion of the saw above the table and that portion of the saw above the material being cut. The hood and mounting shall be arranged so that the hood will automatically adjust itself to the thickness of and remain in contact with the material being cut but it shall not offer any considerable resistance to insertion of material to saw or to passage of the material being sawed. The hood shall be made of adequate strength to resist blows and strains incidental to reasonable operation, adjusting, and handling, and shall be so designed as to protect the operator from flying splinters and broken saw teeth. It shall be made of material that is soft enough so that it will be unlikely to cause tooth breakage. The hood shall be so mounted as to insure that its operation will be po
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.