Espinal Stone Masonry, LLC: OSHA inspections and violations

Raleigh, North Carolina · Masonry Contractors · NAICS 238140

3inspections
9citation items
$10,600current penalties
May 8, 2017last inspection

OSHA has inspected Espinal Stone Masonry, LLC 3 times in North Carolina since 2014.

The latest one began on May 8, 2017 to follow up on an earlier case, in Raleigh.

Those inspections ended with 9 citation items: 9 serious.

Penalties were first proposed at $10,600 and still stand at $10,600.

Scaffolds, general requirements comes up most often in these citations: 8 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Espinal Stone Masonry, LLC averages $9,600 (1 cited inspection).

Espinal Stone Masonry, LLC: OSHA citation items per year, 2014 to 2017
Citation items per year, by inspection date.

North Carolina · latest 90 days of OSHA records

236employers cited

3 of them in the same industry

Get notified the morning OSHA posts each new citation in North Carolina: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in North Carolina

Checking a subcontractor, a client or your own company? Watch Espinal Stone Masonry, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342307600 OPENED MAY 8, 2017Closed

Follow-up · No inspection · Safety · 3 employees at the site · Closed May 9, 2017

1617 Wynn Trace Ct., Raleigh, NC 27603 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 317984888 OPENED APR 20, 2015Open

Planned · Complete · Safety · 3 employees at the site · Open

1617 Wynn Trace Ct., Raleigh, NC 27603 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(a)(6) · Scaffolds, general requirements
Serious$1,500$1,500May 29, 2015Open
Citation 1, item 1b
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$1,500$1,500May 29, 2015Open
Citation 1, item 1c
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$1,500$1,500May 29, 2015Open
Citation 1, item 1d
29 CFR 1926.451(b)(8) · Scaffolds, general requirements
Serious$1,500$1,500May 29, 2015Open
Citation 1, item 1e
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$1,500$1,500May 29, 2015Open
Citation 1, item 1f
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$2,100$2,100May 29, 2015Open
Citation 1, item 1g
29 CFR 1926.451(h)(1) · Scaffolds, general requirements
Serious$0$0May 29, 2015Open
Citation 1, item 1h
29 CFR 1926.501(c) · Fall protection in construction
Serious$0$0May 29, 2015Open

Inspection 317363943 OPENED MAR 20, 2014Closed

Planned · Partial · Health · 2 employees at the site · Closed Nov 7, 2014

1617 Wynn Trace Ct., Raleigh, NC 27603 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(f)(16) · Scaffolds, general requirements
Serious$1,000$1,000Apr 9, 2014Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(a)(6)

(6) Scaffolds shall be designed by a qualified person and shall be constructed and loaded in accordance with that design. Non-mandatory appendix A to this subpart contains examples of criteria that will enable an employer to comply with paragraph (a) of this section.

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(b)(8)

(8) At all points of a scaffold where the platform changes direction, such as turning a corner, any platform that rests on a bearer at an angle other than a right angle shall be laid first, and platforms which rest at right angles over the same bearer shall be laid second, on top of the first platform.

29 CFR 1926.501 · Fall protection in construction

Other masonry contractors employers in North Carolina

Alert subscribers get notified of each newly cited employer in North Carolina the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.