OSHA SearchOSHA records by employer

Essex Crossings Builders, LLC: OSHA inspections and violations

New York City, New York · Poured Concrete Foundation and Structure Contractors · NAICS 238110

1inspections
1citation items
$4,200current penalties
May 26, 2016last inspection

OSHA has inspected Essex Crossings Builders, LLC once in New York.

The inspection began on May 26, 2016 as a planned inspection, in New York City.

That inspection ended with 1 citation item: 1 serious.

Penalties were first proposed at $6,413 and now stand at $4,200, 35% lower after settlements or reviews.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Essex Crossings Builders, LLC averages $4,200 (1 cited inspection).

Essex Crossings Builders, LLC: OSHA citation items per year, 2016 to 2016
Citation items per year, by inspection date.

New York · latest 90 days of OSHA records

376employers cited

5 of them in the same industry

Get notified the morning OSHA posts each new citation in New York: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in New York

Checking a subcontractor, a client or your own company? Watch Essex Crossings Builders, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341519544 OPENED MAY 26, 2016Closed

Planned · Complete · Safety · 20 employees at the site · Closed Dec 20, 2016

145 Clinton St, New York City, NY 10004 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.403(e) · Electrical equipment on job sites
Serious$6,413$4,200Sep 30, 2016Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(e)

(e) Splices. Conductors shall be spliced or joined with splicing devices designed for the use or by brazing, welding, or soldering with a fusible metal or alloy. Soldered splices shall first be so spliced or joined as to be mechanically and electrically secure without solder and then soldered. All splices and joints and the free ends of conductors shall be covered with an insulation equivalent to that of the conductors or with an insulating device designed for the purpose.

Other poured concrete foundation and structure contractors employers in New York

Alert subscribers get notified of each newly cited employer in New York the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.