OSHA SearchOSHA records by employer

Est Electrical Contractors & Engineers Corp: OSHA inspections and violations

Ponce, Puerto Rico · Electrical Contractors and Other Wiring Installation Contractors · NAICS 238210

4inspections
15citation items
$6,900current penalties
Aug 30, 2018last inspection

Since 2011, OSHA inspectors have visited Est Electrical Contractors & Engineers Corp in Puerto Rico 4 times.

The most recent inspection opened on Aug 30, 2018 after an accident, in Salinas.

In all, OSHA issued 15 citation items: 14 serious and 1 other-than-serious.

The proposed penalties came to $19,800; today they stand at $6,900, 65% less.

The rule cited most here is 1926.952 (job briefing), 3 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Est Electrical Contractors & Engineers Corp averages $6,200 across 1 cited inspection.

Est Electrical Contractors & Engineers Corp: OSHA citation items per year, 2011 to 2018
Citation items per year, by inspection date.

Puerto Rico · latest 90 days of OSHA records

109employers cited

2 of them in the same industry

Get notified the morning OSHA posts each new citation in Puerto Rico: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Puerto Rico

Checking a subcontractor, a client or your own company? Watch Est Electrical Contractors & Engineers Corp and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343442745 OPENED AUG 30, 2018Closed

Accident · Partial · Safety · 3 employees at the site · Closed Jul 1, 2019

Camp Santiago Joint Training Center Guardia Nacional De Puerto Rico, Salinas, PR 00751 · Power and Communication Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Incident on Aug 22, 2018: Employee receives electrical shock and burns while working o

At 8:00 a.m. on August 22, 2018, an employee was installing a power line to a transformer. The employee was unaware that the lines were energized to 2400V and received an electrical shock and burns when he touched the energized lines. The employee was hospitalized for his injuries.)

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.454(a) · Scaffold training
Serious$2,000$1,000Feb 25, 2019Final
Citation 1, item 2
29 CFR 1926.950(d) · Electric Power Transmission and Distribution: general
Serious$2,000$1,000Feb 25, 2019Final
Citation 1, item 3a
29 CFR 1926.952(a)(1) · Job briefing
Serious$2,000$1,000Feb 25, 2019Final
Citation 1, item 3b
29 CFR 1926.952(a)(2) · Job briefing
Serious$0$0Feb 25, 2019Final
Citation 1, item 3c
29 CFR 1926.952(b) · Job briefing
Serious$0$0Feb 25, 2019Final
Citation 1, item 4a
29 CFR 1926.956(d)(3) · Hand and portable power equipment
Serious$2,000$1,000Feb 25, 2019Final
Citation 1, item 4b
29 CFR 1926.959(d)(1) · Mechanical equipment
Serious$2,000$0Feb 25, 2019Final
Citation 1, item 4c
29 CFR 1926.959(d)(3) · Mechanical equipment
Serious$2,000$0Feb 25, 2019Final
Citation 1, item 7a
29 CFR 1926.962(b) · Grounding for the protection of employees
Serious$2,000$1,000Feb 25, 2019Final
Citation 1, item 7b
29 CFR 1926.962(c) · Grounding for the protection of employees
Serious$2,000$0Feb 25, 2019Final
Citation 1, item 9
29 CFR 1926.963(b)(1) · Testing and test facilities
Serious$2,000$1,000Feb 25, 2019Final
Citation 2, item 1
29 CFR 6 B
Other-than-serious$400$200Feb 25, 2019Final

Inspection 317479475 OPENED SEP 24, 2014Closed

Unprogrammed other · Complete · Safety · 5 employees at the site · Closed Oct 27, 2014

Pr 14 Ave Stgo De Los Caballeros Int C/obispado Bo, Ponce, PR 00730 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 317478238 OPENED APR 14, 2014Closed

Unprogrammed other · Complete · Safety · 2 employees at the site · Closed Jul 18, 2014

Carr 506 Km 1 Bo Coto Laurel, Ponce, PR 00780 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.405(a)(2)(iic) · Job-site wiring
Serious$500$250Jun 25, 2014Closed
Citation 1, item 2
29 CFR 1926.405(e)(1) · Job-site wiring
Serious$500$250Jun 25, 2014Closed
Citation 1, item 3
29 CFR 1926.405(g)(2)(iii) · Job-site wiring
Serious$400$200Jun 25, 2014Closed

Inspection 314627001 OPENED MAR 30, 2011Closed

Unprogrammed other · Complete · Safety · 7 employees at the site · Closed Jul 1, 2011

Ave Munoz Rivera 73, Florida, PR 00650 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(a)(2)(iic)

(C) Receptacles shall be of the grounding type. Unless installed in a complete metallic raceway, each branch circuit shall contain a separate equipment grounding conductor, and all receptacles shall be electrically connected to the grounding conductor. Receptacles for uses other than temporary lighting shall not be installed on branch circuits which supply temporary lighting. Receptacles shall not be connected to the same ungrounded conductor of multiwire circuits which supply temporary lighting.

29 CFR 1926.405(e)(1)

(e) Enclosures for damp or wet locations—(1) Cabinets, fittings, and boxes. Cabinets, cutout boxes, fittings, boxes, and panelboard enclosures in damp or wet locations shall be installed so as to prevent moisture or water from entering and accumulating within the enclosures. In wet locations the enclosures shall be weatherproof.

29 CFR 1926.405(g)(2)(iii)

(iii) Splices. Flexible cords shall be used only in continuous lengths without splice or tap. Hard service flexible cords No. 12 or larger may be repaired if spliced so that the splice retains the insulation, outer sheath properties, and usage characteristics of the cord being spliced.

29 CFR 1926.454 · Scaffold training

29 CFR 1926.950 · Electric Power Transmission and Distribution: general

29 CFR 1926.952 · Job briefing

29 CFR 1926.956 · Hand and portable power equipment

29 CFR 1926.959 · Mechanical equipment

29 CFR 1926.962 · Grounding for the protection of employees

29 CFR 1926.963 · Testing and test facilities

Other electrical contractors and other wiring installation contractors employers in Puerto Rico

Alert subscribers get notified of each newly cited employer in Puerto Rico the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.