OSHA SearchOSHA records by employer

Etowah Utilities - Electric Department: OSHA inspections and violations

Etowah, Tennessee · Electric Power Distribution · NAICS 221122

1inspections
3citation items
$0current penalties
Jan 8, 2026last inspection

Etowah Utilities - Electric Department has one OSHA inspection on record in Tennessee.

OSHA opened it on Jan 8, 2026 as a planned inspection, in Etowah, and the case has not closed yet.

From that inspection OSHA issued 3 citation items: 3 serious.

OSHA did not attach a penalty to any of these citations.

For context, across all utility employers the median penalty per cited inspection since 2015 is $0. Etowah Utilities - Electric Department averages $0 over 1 cited inspection in that time.

Etowah Utilities - Electric Department: OSHA citation items per year, 2026 to 2026
Citation items per year, by inspection date.

Tennessee · latest 90 days of OSHA records

326employers cited

Get notified the morning OSHA posts each new citation in Tennessee: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Tennessee

Checking a subcontractor, a client or your own company? Watch Etowah Utilities - Electric Department and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348677469 OPENED JAN 8, 2026Open

Planned · Complete · Safety · Local government · 15 employees at the site · Open

1313 Tennessee Avenue, Etowah, TN 37331 · Electric Power Distribution · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.29(f)(4) · Fall protection systems in general industry
Serious$0$0Jan 23, 2026Final
Citation 1, item 2
29 CFR 1910.304(g)(5) · Grounding and circuit protection
Serious$0$0Jan 23, 2026Final
Citation 1, item 3
29 CFR 1910.305(b)(2)(i) · Electrical wiring methods
Serious$0$0Jan 23, 2026Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.29 · Fall protection systems in general industry

29 CFR 1910.29(f)(4)

(4) Openings in stair rails. No opening in a stair rail system exceeds 19 inches (48 cm) at its least dimension.

29 CFR 1910.304 · Grounding and circuit protection

29 CFR 1910.304(g)(5)

(5) Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent, continuous, and effective.

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.305(b)(2)(i)

(2) Covers and canopies. (i) All pull boxes, junction boxes, and fittings shall be provided with covers identified for the purpose. If metal covers are used, they shall be grounded. In completed installations, each outlet box shall have a cover, faceplate, or fixture canopy. Covers of outlet boxes having holes through which flexible cord pendants pass shall be provided with bushings designed for the purpose or shall have smooth, well-rounded surfaces on which the cords may bear.

Other electric power distribution employers in Tennessee

Alert subscribers get notified of each newly cited employer in Tennessee the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.