OSHA SearchOSHA records by employer

Evolution Industries: OSHA inspections and violations

Verdi, Nevada · Poured Concrete Foundation and Structure Contractors · NAICS 238110

2inspections
4citation items
$2,142current penalties
Nov 30, 2018last inspection

Since 2018, OSHA inspectors have visited Evolution Industries in Nevada 2 times.

The most recent inspection opened on Nov 30, 2018 on a referral, in Verdi.

In all, OSHA issued 4 citation items: 4 serious.

The proposed penalties came to $3,060; today they stand at $2,142, 30% less.

The rule cited most here is 1910.213 (woodworking machinery), 3 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,078 penalty. Evolution Industries averages $2,142 across 1 cited inspection.

Evolution Industries: OSHA citation items per year, 2018 to 2018
Citation items per year, by inspection date.

Want to know if OSHA cites Evolution Industries again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 343630257 OPENED NOV 30, 2018Closed

Referral · Partial · Health · 18 employees at the site · Closed Dec 7, 2018

2775 West U.s. 40, Suite 101, Verdi, NV 89439 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 343630299 OPENED NOV 30, 2018Closed

Referral · Partial · Safety · 13 employees at the site · Closed Mar 13, 2019

2775 West U.s. 40, Suite 101, Verdi, NV 89439 · Flooring Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.213(c)(1) · Woodworking machinery
Serious$1,530$1,071Jan 17, 2019Final
Citation 1, item 1b
29 CFR 1910.213(c)(2) · Woodworking machinery
Serious$0$0Jan 17, 2019Final
Citation 1, item 1c
29 CFR 1910.213(c)(3) · Woodworking machinery
Serious$0$0Jan 17, 2019Final
Citation 1, item 2
29 CFR 1910.303(g)(2)(i) · Electrical equipment, general requirements
Serious$1,530$1,071Jan 17, 2019Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.213 · Woodworking machinery

29 CFR 1910.213(c)(1)

(c) Hand-fed ripsaws. (1) Each circular hand-fed ripsaw shall be guarded by a hood which shall completely enclose that portion of the saw above the table and that portion of the saw above the material being cut. The hood and mounting shall be arranged so that the hood will automatically adjust itself to the thickness of and remain in contact with the material being cut but it shall not offer any considerable resistance to insertion of material to saw or to passage of the material being sawed. The hood shall be made of adequate strength to resist blows and strains incidental to reasonable operation, adjusting, and handling, and shall be so designed as to protect the operator from flying splinters and broken saw teeth. It shall be made of material that is soft enough so that it will be unlikely to cause tooth breakage. The hood shall be so mounted as to insure that its operation will be po

29 CFR 1910.213(c)(2)

(2) Each hand-fed circular ripsaw shall be furnished with a spreader to prevent material from squeezing the saw or being thrown back on the operator. The spreader shall be made of hard tempered steel, or its equivalent, and shall be thinner than the saw kerf. It shall be of sufficient width to provide adequate stiffness or rigidity to resist any reasonable side thrust or blow tending to bend or throw it out of position. The spreader shall be attached so that it will remain in true alignment with the saw even when either the saw or table is tilted. The provision of a spreader in connection with grooving, dadoing, or rabbeting is not required. On the completion of such operations, the spreader shall be immediately replaced.

29 CFR 1910.213(c)(3)

(3) Each hand-fed circular ripsaw shall be provided with nonkickback fingers or dogs so located as to oppose the thrust or tendency of the saw to pick up the material or to throw it back toward the operator. They shall be designed to provide adequate holding power for all the thicknesses of materials being cut.

29 CFR 1910.303 · Electrical equipment, general requirements

Other poured concrete foundation and structure contractors employers in Nevada

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.