OSHA SearchOSHA records by employer

Firstcall Mechanical, LLC: OSHA inspections and violations

Tampa, Florida · Water and Sewer Line and Related Structures Construction · NAICS 237110

1inspections
4citation items
$34,782current penalties
Dec 2, 2024last inspection

OSHA inspectors have visited Firstcall Mechanical, LLC in Florida one time.

It opened on Dec 2, 2024 after a complaint, in Tampa.

In all, OSHA issued 4 citation items: 3 serious and 1 other-than-serious.

The penalties, $34,782 in total, stand where OSHA first set them.

The rule cited most here is 1926.651 (excavations), 2 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,079 penalty. Firstcall Mechanical, LLC averages $34,782 across 1 cited inspection.

Firstcall Mechanical, LLC: OSHA citation items per year, 2024 to 2024
Citation items per year, by inspection date.

Want to know if OSHA cites Firstcall Mechanical, LLC again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 347907669 OPENED DEC 2, 2024Closed

Complaint · Partial · Safety · 4 employees at the site · Closed Feb 18, 2025

3839 Usf Holly Dr, Tampa, FL 33620 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.651(c)(2) · Excavations
Serious$11,292$11,292Jan 3, 2025Final
Citation 1, item 2
29 CFR 1926.651(k)(1) · Excavations
Serious$11,292$11,292Jan 3, 2025Final
Citation 1, item 3
29 CFR 1926.652(a)(1) · Trench protection
Serious$11,292$11,292Jan 3, 2025Final
Citation 2, item 1
29 CFR 1926.21(b)(2) · Construction safety training
Other-than-serious$906$906Jan 3, 2025Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.21 · Construction safety training

29 CFR 1926.21(b)(2)

(2) The employer shall instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his work environment to control or eliminate any hazards or other exposure to illness or injury.

29 CFR 1926.651 · Excavations

29 CFR 1926.651(c)(2)

(2) Means of egress from trench excavations. A stairway, ladder, ramp or other safe means of egress shall be located in trench excavations that are 4 feet (1.22 m) or more in depth so as to require no more than 25 feet (7.62 m) of lateral travel for employees.

29 CFR 1926.651(k)(1)

(k) Inspections. (1) Daily inspections of excavations, the adjacent areas, and protective systems shall be made by a competent person for evidence of a situation that could result in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions. An inspection shall be conducted by the competent person prior to the start of work and as needed throughout the shift. Inspections shall also be made after every rainstorm or other hazard increasing occurrence. These inspections are only required when employee exposure can be reasonably anticipated.

29 CFR 1926.652 · Trench protection

Other water and sewer line and related structures construction employers in Florida

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.