OSHA SearchOSHA records by employer

Four Seasons Masonry: OSHA inspections and violations

Jackson, Mississippi · Masonry Contractors · NAICS 238140

4inspections
6citation items
$15,587current penalties
Apr 13, 2017last inspection

Since 2010, OSHA inspectors have visited Four Seasons Masonry in Mississippi 4 times.

The most recent inspection opened on Apr 13, 2017 to follow up on an earlier case, in Jackson.

In all, OSHA issued 6 citation items: 5 serious and 1 other-than-serious.

The penalties, $15,587 in total, stand where OSHA first set them.

The rule cited most here is 1926.451 (scaffolds, general requirements), 5 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Four Seasons Masonry averages $15,212 across 1 cited inspection.

Four Seasons Masonry: OSHA citation items per year, 2010 to 2017
Citation items per year, by inspection date.

Mississippi · latest 90 days of OSHA records

16employers cited

Get notified the morning OSHA posts each new citation in Mississippi: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Mississippi

Checking a subcontractor, a client or your own company? Watch Four Seasons Masonry and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342249687 OPENED APR 13, 2017Closed

Follow-up · Partial · Safety · 7 employees at the site · Closed Apr 14, 2017

7020 Medger Evers Blvd., Jackson, MS 39213 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 341892982 OPENED NOV 2, 2016Closed

Unprogrammed other · Partial · Safety · 7 employees at the site · Closed Mar 29, 2023

7020 Medger Evers Blvd, Jackson, MS 39213 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$3,803$3,803Feb 21, 2017Final
Citation 1, item 2
29 CFR 1926.451(c)(1)(ii) · Scaffolds, general requirements
Serious$3,803$3,803Feb 21, 2017Final
Citation 1, item 3
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$3,803$3,803Feb 21, 2017Final
Citation 1, item 4
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Serious$3,803$3,803Feb 21, 2017Final
Citation 2, item 1
29 CFR 1926.451(f)(3) · Scaffolds, general requirements
Other-than-serious$0$0Feb 21, 2017Final

Inspection 313631327 OPENED JUN 4, 2010Closed

Planned · Partial · Safety · 9 employees at the site · Closed Jun 4, 2010

651 James M Davis Drive, Jackson, MS 39206 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 313628513 OPENED JAN 12, 2010Closed

Planned · Complete · Safety · 16 employees at the site · Closed Jun 7, 2012

651 James M Davis Drive, Jackson, MS 39206 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.134(d)(1)(ii) · Respiratory protection
Serious$375$375Jan 29, 2010Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(d)(1)(ii)

(ii) The employer shall select a NIOSH-certified respirator. The respirator shall be used in compliance with the conditions of its certification.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(c)(1)(ii)

(ii) Guys, ties, and braces shall be installed according to the scaffold manufacturer's recommendations or at the closest horizontal member to the 4:1 height and be repeated vertically at locations of horizontal members every 20 feet (6.1 m) or less thereafter for scaffolds 3 feet (0.91 m) wide or less, and every 26 feet (7.9 m) or less thereafter for scaffolds greater than 3 feet (0.91 m) wide. The top guy, tie or brace of completed scaffolds shall be placed no further than the 4:1 height from the top. Such guys, ties and braces shall be installed at each end of the scaffold and at horizontal intervals not to exceed 30 feet (9.1 m) (measured from one end [not both] towards the other).

Other masonry contractors employers in Mississippi

Alert subscribers get notified of each newly cited employer in Mississippi the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.