Inspection 343422168 OPENED AUG 28, 2018Closed
3680 Easton Market, Columbus, OH 43219 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps
Incident on Aug 23, 2018: Employee receives first and second degree burns after arc fl
At 10:00 a.m. on August 23, 2018, Employee #1 was pulling a bolt from a 480-volt meter socket to open up the meter enclosure cover, to verify the load wires were deenergized. Employee #1 then began loosening the terminal bolts for the load wires and upon attempting to remove the neutral wire, an arc flash/blast occurred in the meter enclosure. The meter was not deenergized and no electrical protective equipment was in use. As a result, the incident energy from the electrical arc flash caused Employee #1's burn injuries. Afterwards, Employee #1 was then transported by Emergency Medical Services (EMS) and hospitalized. Employee #1 suffered first and second degree burns on the left side of his body and also sustained second degree burns to the arm, neck, and face. First degree burns were also present on his left chest and abdomen. abdomen.
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.21(b)(2) · Construction safety training |
Serious | $3,696 | $2,587 | Sep 27, 2018 | Final |
| Citation 1, item 2 29 CFR 1926.403(a) · Electrical equipment on job sites |
Serious | $3,696 | $2,587 | Sep 27, 2018 | Final |
| Citation 1, item 3a 29 CFR 1926.95(a) · Criteria for personal protective equipment |
Serious | $5,174 | $3,622 | Sep 27, 2018 | Final |
| Citation 1, item 3b 29 CFR 1926.416(a)(1) · Electrical safety in construction |
Serious | $0 | $0 | Sep 27, 2018 | Final |