FS Newport Masonry and Tile LLC: OSHA inspections and violations

Newport, Rhode Island · Tile and Terrazzo Contractors · NAICS 238340

3inspections
12citation items
$7,328current penalties
Jul 21, 2015last inspection

Since 2013, OSHA inspectors have visited FS Newport Masonry and Tile LLC in Rhode Island 3 times.

The most recent inspection opened on Jul 21, 2015 as a planned inspection, in Newport.

In all, OSHA issued 12 citation items: 12 serious.

The proposed penalties came to $11,760; today they stand at $7,328, 38% less.

The rule cited most here is 1926.62 (lead in construction), 7 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. FS Newport Masonry and Tile LLC averages $2,000 across 1 cited inspection.

FS Newport Masonry and Tile LLC: OSHA citation items per year, 2013 to 2015
Citation items per year, by inspection date.

Rhode Island · latest 90 days of OSHA records

79employers cited

Get notified the morning OSHA posts each new citation in Rhode Island: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Rhode Island

Checking a subcontractor, a client or your own company? Watch FS Newport Masonry and Tile LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 340788991 OPENED JUL 21, 2015Closed

Planned · Partial · Safety · 3 employees at the site · Closed Sep 12, 2018

Prairie Avenue, Newport, RI 02840 · Tile and Terrazzo Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(b)(1)(i) · Scaffolds, general requirements
Serious$2,800$2,000Sep 23, 2015Final
Citation 1, item 1b
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$1,600$0Sep 23, 2015Final
Citation 1, item 1c
29 CFR 1926.451(f)(3) · Scaffolds, general requirements
Serious$1,600$0Sep 23, 2015Final

Inspection 339845463 OPENED JUL 7, 2014Closed

Planned · Partial · Health · 2 employees at the site · Closed Mar 10, 2016

42 Mann Street, Newport, RI 02840 · Tile and Terrazzo Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.62(d)(1)(i) · Lead in construction
Serious$1,440$1,008Oct 27, 2014Final
Citation 1, item 1b
29 CFR 1926.62(d)(2)(v)(a) · Lead in construction
Serious$0$0Oct 27, 2014Final
Citation 1, item 1c
29 CFR 1926.62(d)(2)(v)(b) · Lead in construction
Serious$0$0Oct 27, 2014Final
Citation 1, item 1d
29 CFR 1926.62(d)(2)(v)(c) · Lead in construction
Serious$0$0Oct 27, 2014Final
Citation 1, item 1e
29 CFR 1926.62(d)(2)(v)(d) · Lead in construction
Serious$0$0Oct 27, 2014Final
Citation 1, item 1f
29 CFR 1926.62(d)(2)(v)(e) · Lead in construction
Serious$0$0Oct 27, 2014Final
Citation 1, item 1g
29 CFR 1926.62(d)(2)(v)(f) · Lead in construction
Serious$0$0Oct 27, 2014Final

Inspection 339002131 OPENED APR 11, 2013Closed

Unprogrammed other · Complete · Safety · 5 employees at the site · Closed Mar 24, 2015

543 Thames St., Newport, RI 02840 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.100(a) · Hard hats in construction
Serious$1,800$1,800Jun 5, 2013Final
Citation 1, item 2
29 CFR 1926.102(a)(1) · Eye and face protection in construction
Serious$2,520$2,520Jun 5, 2013Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.100 · Hard hats in construction

29 CFR 1926.100(a)

(a) Employees working in areas where there is a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, shall be protected by protective helmets.

29 CFR 1926.102 · Eye and face protection in construction

29 CFR 1926.102(a)(1)

(a) General. (1) The employer shall ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)(i)

(i) Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) shall be installed so that the space between adjacent units and the space between the platform and the uprights is no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary (for example, to fit around uprights when side brackets are used to extend the width of the platform).

29 CFR 1926.62 · Lead in construction

Other tile and terrazzo contractors employers in Rhode Island

Alert subscribers get notified of each newly cited employer in Rhode Island the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.