OSHA SearchOSHA records by employer

Gerardo Morales: OSHA inspections and violations

Wilmington, North Carolina · Roofing Contractors · NAICS 238160

1inspections
5citation items
$4,500current penalties
Apr 28, 2025last inspection

OSHA inspectors have visited Gerardo Morales in North Carolina one time.

It opened on Apr 28, 2025 as a planned inspection, in Wilmington and is still open.

In all, OSHA issued 5 citation items: 4 serious and 1 other-than-serious.

The penalties, $4,500 in total, stand where OSHA first set them.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Gerardo Morales averages $4,500 across 1 cited inspection.

Gerardo Morales: OSHA citation items per year, 2025 to 2025
Citation items per year, by inspection date.

North Carolina · latest 90 days of OSHA records

237employers cited

16 of them in the same industry

Get notified the morning OSHA posts each new citation in North Carolina: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in North Carolina

Checking a subcontractor, a client or your own company? Watch Gerardo Morales and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348211186 OPENED APR 28, 2025Open

Planned · Complete · Health · 2 employees at the site · Open

3602 Princess Place Drive, Wilmington, NC 28405 · Roofing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.100(a) · Hard hats in construction
Serious$750$750Jun 12, 2025Final
Citation 1, item 2
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$1,000$1,000Jun 12, 2025Final
Citation 1, item 3
29 CFR 1926.503(a)(1) · Fall protection training in construction
Serious$1,000$1,000Jun 12, 2025Final
Citation 1, item 4
29 CFR 1926.1053(b)(1) · Ladders in construction
Serious$1,000$1,000Jun 12, 2025Final
Citation 2, item 1
29 CFR 1903.19(c)(1) · Proving cited hazards were fixed
Other-than-serious$750$750Aug 12, 2025Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1903.19 · Proving cited hazards were fixed

29 CFR 1903.19(c)(1)

(c) Abatement certification. (1) Within 10 calendar days after the abatement date, the employer must certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section.

29 CFR 1926.100 · Hard hats in construction

29 CFR 1926.100(a)

(a) Employees working in areas where there is a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, shall be protected by protective helmets.

29 CFR 1926.1053 · Ladders in construction

29 CFR 1926.1053(b)(1)

(1) When portable ladders are used for access to an upper landing surface, the ladder side rails shall extend at least 3 feet (.9 m) above the upper landing surface to which the ladder is used to gain access; or, when such an extension is not possible because of the ladder's length, then the ladder shall be secured at its top to a rigid support that will not deflect, and a grasping device, such as a grabrail, shall be provided to assist employees in mounting and dismounting the ladder. In no case shall the extension be such that ladder deflection under a load would, by itself, cause the ladder to slip off its support.

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.503 · Fall protection training in construction

Other roofing contractors employers in North Carolina

Alert subscribers get notified of each newly cited employer in North Carolina the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.