OSHA SearchOSHA records by employer

GF Construction Group LLC: OSHA inspections and violations

Palm Bay, Florida · New Multifamily Housing Construction (except For-Sale Builders) · NAICS 236116

1inspections
7citation items
$5,618current penalties
Dec 5, 2025last inspection

OSHA inspectors have visited GF Construction Group LLC in Florida one time.

It opened on Dec 5, 2025 as a planned inspection, in Palm Bay and is still open.

In all, OSHA issued 7 citation items: 7 serious.

The proposed penalties came to $10,214; today they stand at $5,618, 45% less.

The rule cited most here is 1926.451 (scaffolds, general requirements), 6 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. GF Construction Group LLC averages $5,618 across 1 cited inspection.

GF Construction Group LLC: OSHA citation items per year, 2025 to 2025
Citation items per year, by inspection date.

Florida · latest 90 days of OSHA records

338employers cited

3 of them in the same industry

Get notified the morning OSHA posts each new citation in Florida: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Florida

Checking a subcontractor, a client or your own company? Watch GF Construction Group LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348629627 OPENED DEC 5, 2025Open

Planned · Partial · Safety · 7 employees at the site · Open

2108 Agora Circle Se, Palm Bay, FL 32909 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.100(a) · Hard hats in construction
Serious$2,270$1,248Mar 6, 2026Final
Citation 1, item 2
29 CFR 1926.451(b)(1)(i) · Scaffolds, general requirements
Serious$3,972$2,185Mar 6, 2026Final
Citation 1, item 3a
29 CFR 1926.451(c)(2)(i) · Scaffolds, general requirements
Serious$3,972$2,185Mar 6, 2026Final
Citation 1, item 3b
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$0$0Mar 6, 2026Final
Citation 1, item 3c
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Serious$0$0Mar 6, 2026Final
Citation 1, item 3d
29 CFR 1926.451(g)(4)(iv) · Scaffolds, general requirements
Serious$0$0Mar 6, 2026Final
Citation 1, item 3e
29 CFR 1926.451(h)(2)(ii) · Scaffolds, general requirements
Serious$0$0Mar 6, 2026Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.100 · Hard hats in construction

29 CFR 1926.100(a)

(a) Employees working in areas where there is a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, shall be protected by protective helmets.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)(i)

(i) Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) shall be installed so that the space between adjacent units and the space between the platform and the uprights is no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary (for example, to fit around uprights when side brackets are used to extend the width of the platform).

29 CFR 1926.451(c)(2)(i)

(i) Footings shall be level, sound, rigid, and capable of supporting the loaded scaffold without settling or displacement.

Other new multifamily housing construction (except for-sale builders) employers in Florida

Alert subscribers get notified of each newly cited employer in Florida the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.