Inspection 349151290 OPENED SEP 3, 2026Open
#110 Avenida 21 De Diciembre, Sabana Grande, PR 00637 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection so far.
Sabana Grande, Puerto Rico · Commercial and Institutional Building Construction · NAICS 236220
Gilberto Ramirez Cruz has 3 OSHA inspections on record in Puerto Rico, the first in 2015.
OSHA's last visit started on Sep 3, 2026 on a referral, in Sabana Grande, and the case has not closed yet.
Across those inspections OSHA issued 8 citation items: 4 serious and 4 other-than-serious.
OSHA proposed $1,325 in penalties. After settlements and reviews the total is $730, down 45%.
Most often, OSHA cited 1926.451, scaffolds, general requirements (3 items).
For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Gilberto Ramirez Cruz averages $365 over 2 cited inspections in that time.
Puerto Rico · latest 90 days of OSHA records
109employers cited
8 of them in the same industry
Get notified the morning OSHA posts each new citation in Puerto Rico: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Puerto Rico
Checking a subcontractor, a client or your own company? Watch Gilberto Ramirez Cruz and get notified the morning OSHA posts a new citation for it.
Watch this company#110 Avenida 21 De Diciembre, Sabana Grande, PR 00637 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection so far.
Ave. 5 De Diciembre # 110, Sabana Grande, PR 00637 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1926.451(g)(1)(vi) · Scaffolds, general requirements |
Serious | $800 | $400 | Jun 2, 2016 | Final |
| Citation 1, item 1b 29 CFR 1926.451(b)(5)(ii) · Scaffolds, general requirements |
Serious | $0 | $0 | Jun 2, 2016 | Final |
| Citation 2, item 1 29 CFR 1926.451(h)(1) · Scaffolds, general requirements |
Other-than-serious | $0 | $0 | Jun 2, 2016 | Final |
| Citation 2, item 2 29 CFR 1926.452(a)(9) · Rules for each type of scaffold |
Other-than-serious | $0 | $0 | Jun 2, 2016 | Final |
| Citation 2, item 3 29 CFR 1926.1052(c)(1)(i) · Stairways in construction |
Other-than-serious | $0 | $0 | Jun 2, 2016 | Final |
Ave. 21 De Diciembre # 110, Sabana Grande, PR 00637 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.501(b)(1) · Fall protection in construction |
Serious | $300 | $180 | Oct 2, 2015 | Final |
| Citation 1, item 2 29 CFR 1926.404(b)(1)(ii) · Ground-fault protection on job sites |
Serious | $225 | $150 | Oct 2, 2015 | Final |
| Citation 2, item 1 29 CFR 1926.503(a)(1) · Fall protection training in construction |
Other-than-serious | $0 | $0 | Oct 2, 2015 | Final |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1926.404(b)(1)(ii)
(ii) Ground-fault circuit interrupters. All 120-volt, single-phase, 15- and 20-ampere receptacle outlets on construction sites, which are not a part of the permanent wiring of the building or structure and which are in use by employees, shall have approved ground-fault circuit interrupters for personnel protection. Receptacles on a two-wire, single-phase portable or vehicle-mounted generator rated not more than 5kW, where the circuit conductors of the generator are insulated from the generator frame and all other grounded surfaces, need not be protected with ground-fault circuit interrupters.
29 CFR 1926.451(b)(5)(ii)
(ii) Each platform greater than 10 feet in length shall not extend over its support more than 18 inches (46 cm), unless it is designed and installed so that the cantilevered portion of the platform is able to support employees without tipping, or has guardrails which block employee access to the cantilevered end.
Alert subscribers get notified of each newly cited employer in Puerto Rico the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.