OSHA SearchOSHA records by employer

Global International Construction: OSHA inspections and violations

Fayetteville, Georgia · Drywall and Insulation Contractors · NAICS 238310

2inspections
8citation items
$5,913current penalties
May 1, 2018last inspection

Global International Construction has 2 OSHA inspections on record in Georgia, the first in 2005.

OSHA's last visit started on May 1, 2018 as a planned inspection, in Gainesville.

Across those inspections OSHA issued 8 citation items: 8 serious.

OSHA proposed $11,022 in penalties. After settlements and reviews the total is $5,913, down 46%.

Most often, OSHA cited 1926.451, scaffolds, general requirements (5 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Global International Construction averages $1,663 over 1 cited inspection in that time.

Global International Construction: OSHA citation items per year, 2005 to 2018
Citation items per year, by inspection date.

Georgia · latest 90 days of OSHA records

148employers cited

Get notified the morning OSHA posts each new citation in Georgia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Georgia

Checking a subcontractor, a client or your own company? Watch Global International Construction and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343140224 OPENED MAY 1, 2018Closed

Planned · Complete · Safety · 3 employees at the site · Closed Aug 3, 2018

1260 Dawsonville Hwy, Gainesville, GA 30504 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.453(b)(2)(v) · Aerial lifts
Serious$2,772$1,663Jun 25, 2018Final

Inspection 309253185 OPENED NOV 15, 2005Closed

Planned · Partial · Safety · 5 employees at the site · Closed Feb 6, 2006

140 Southe Hwy 92, Fayetteville, GA 30215 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.304(i)(1) · Woodworking tools
Serious$1,500$750Dec 21, 2005Closed
Citation 1, item 2
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$1,500$750Dec 21, 2005Closed
Citation 1, item 3
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$750$375Dec 21, 2005Closed
Citation 1, item 4
29 CFR 1926.451(c)(2)(ii) · Scaffolds, general requirements
Serious$750$500Dec 21, 2005Closed
Citation 1, item 5
29 CFR 1926.451(e)(6)(i) · Scaffolds, general requirements
Serious$1,500$500Dec 21, 2005Closed
Citation 1, item 6
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$1,500$1,000Dec 21, 2005Closed
Citation 1, item 7
29 CFR 1926.452(c)(2) · Rules for each type of scaffold
Serious$750$375Dec 21, 2005Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.304 · Woodworking tools

29 CFR 1926.304(i)(1)

(i) Hand-fed ripsaws. (1) Each circular hand-fed ripsaw shall be guarded by a hood which shall completely enclose that portion of the saw above the table and that portion of the saw above the material being cut. The hood and mounting shall be arranged so that the hood will automatically adjust itself to the thickness of and remain in contact with the material being cut but it shall not offer any considerable resistance to insertion of material to saw or to passage of the material being sawed. The hood shall be made of adequate strength to resist blows and strains incidental to reasonable operation, adjusting, and handling, and shall be so designed as to protect the operator from flying splinters and broken saw teeth. It shall be made of material that is soft enough so that it will be unlikely to cause tooth breakage. The hood shall be so mounted as to insure that its operation will be po

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(c)(2)

(2) Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation.

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.453 · Aerial lifts

Other drywall and insulation contractors employers in Georgia

Alert subscribers get notified of each newly cited employer in Georgia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.