Gordon Construction Co., Inc.: OSHA inspections and violations
Stigler, Oklahoma · Power and Communication Line and Related Structures Construction · NAICS 237130
5inspections
8citation items
$18,307current penalties
Jun 9, 2021last inspection
Since 2001, OSHA inspectors have visited Gordon Construction Co., Inc. in Oklahoma 5 times.
The most recent inspection opened on Jun 9, 2021 on a referral, in Talihina.
In all, OSHA issued 8 citation items: 6 serious and 2 other-than-serious.
The proposed penalties came to $33,831; today they stand at $18,307, 46% less.
The rule cited most here is 1926.950 (electric power transmission and distribution: general), 3 times.
Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Gordon Construction Co., Inc. averages $6,278 across 2 cited inspections.
3 inspections on this page followed a fatal incident.
Gordon Construction Co., Inc. also files yearly injury logs with OSHA, summarized below.
It reported 1 severe injury to OSHA since 2015.
Citation items per year, by inspection date.
Oklahoma · latest 90 days of OSHA records
53employers cited
Get notified the morning OSHA posts each new citation in Oklahoma: the employer, the site address, the rules broken and the penalty.
Checking a subcontractor, a client or your own company? Watch Gordon Construction Co., Inc. and get notified the morning OSHA posts a new citation for it.
Incident on Apr 29, 2002 (fatal): Employee run over by aerial lift truck
A 15-employee power line construction crew met in a rural county road area to co ordinate continued repairs on storm-damaged power lines. The crew mechanic, who was in a truck parked nearby, noticed smoke coming from beneath an aerial lift t ruck. The operator of the aerial lift left his truck with the engine running to discuss line repair operations with other crewmembers. The crew mechanic got out of his vehicle and crawled under the aerial lift to investigate the cause of th e smoke. The aerial lift operator, who was not aware that the mechanic was under his truck, got back in and drove off, running over the mechanic. The mechanic d ied of injuries sustained in the accident.
No citations from this inspection.
Inspection 303647481 OPENED DEC 12, 2001Closed
Accident · Partial · Safety · 54 employees at the site · Closed Aug 7, 2002
Incident on Dec 4, 2001 (fatal): Employee run down by aerial lift truck
A five-employee crew was replacing power lines in a rural county area aside a hi ghway. One member of the crew backed up an aerial lift truck near a utility pole to pull guys. While he was backing up the truck, it struck the crew supervisor, knocking him to the pavement. The supervisor suffered fatal head injuries.
Incident on Jan 3, 2001 (fatal): Electric shock - direct contact with overhead line
An apprentice power line worker working for a contractor and an electrical engin eer working for an electric utility were troubleshooting storm damage so that th ey could report pending repair jobs. Working in a remote area, the apprentice wa s electrocuted as he was removing an overhead power line from a damaged utility pole.
From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.
In 2025, the Stigler site logged 1 recordable injury or illness among about 50 workers: 1.8 per 100 full-time workers, against a median of 1.0 for its industry. Those cases cost 2 days away from work.
Site and year
Workers
Cases
Days-away cases
Rate
Industry median
Gordon Construction Co., Inc
Stigler · 2025
50
1
1
1.8
1.0
Included with any plan: 3 more yearly logs from these sites, back to 2022, with each site's average rate over its latest three years. Already a subscriber? Sign in.
An employee was in a bucket constructing a new electrical distribution line. The employee was connecting a primary phase to a pole. While holding the primary phase in his right hand, his left hand was on the controls of the bucket. A metal part of the bucket contacted a live, energized line and the employee was shocked. The employee also sustained burns to both hands.
The rules behind these citations
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
(2) Within twenty-four (24) hours after the in-patient hospitalization of one or more employees or an employee's amputation or an employee's loss of an eye, as a result of a work-related incident, you must report the in-patient hospitalization, amputation, or loss of an eye to OSHA.
29 CFR 1904.8 · Recording criteria for needlestick and sharps injuries
(a) Protection of employees. (1) No employer shall permit an employee to work in such proximity to any part of an electric power circuit that the employee could contact the electric power circuit in the course of work, unless the employee is protected against electric shock by deenergizing the circuit and grounding it or by guarding it effectively by insulation or other means.
(3) Electrical tests. All electrical tests shall conform to the requirements of ANSI A92.2-1969 section 5. However equivalent d.c.; voltage tests may be used in lieu of the a.c. voltage specified in A92.2-1969; d.c. voltage tests which are approved by the equipment manufacturer or equivalent entity shall be considered an equivalent test for the purpose of this paragraph (b)(3).
Alert subscribers get notified of each newly cited employer in Oklahoma the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.