OSHA SearchOSHA records by employer

Grand River Construction, LLC: OSHA inspections and violations

Logan, Ohio · Framing Contractors · NAICS 238130

2inspections
3citation items
$2,050current penalties
Jul 30, 2020last inspection

Grand River Construction, LLC has 2 OSHA inspections on record in Ohio, the first in 2010.

OSHA's last visit started on Jul 30, 2020 as a planned inspection, in Bay Village.

Across those inspections OSHA issued 3 citation items: 3 serious.

OSHA proposed $3,342 in penalties. After settlements and reviews the total is $2,050, down 39%.

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Grand River Construction, LLC averages $1,735 over 1 cited inspection in that time.

Grand River Construction, LLC: OSHA citation items per year, 2010 to 2020
Citation items per year, by inspection date.

Ohio · latest 90 days of OSHA records

260employers cited

21 of them in the same industry

Get notified the morning OSHA posts each new citation in Ohio: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Ohio

Checking a subcontractor, a client or your own company? Watch Grand River Construction, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344860002 OPENED JUL 30, 2020Closed

Planned · Partial · Safety · 6 employees at the site · Closed Jul 6, 2021

26920 Lake Rd., Bay Village, OH 44140 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$2,892$1,735Jul 31, 2020Final

Inspection 313153306 OPENED JAN 15, 2010Closed

Planned · Partial · Safety · 5 employees at the site · Closed Mar 2, 2010

30621 Chieftan Drive, Logan, OH 43138 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.404(f)(6) · Ground-fault protection on job sites
Serious$450$315Feb 2, 2010Closed
Citation 1, item 1b
29 CFR 1926.405(a)(2)(ii) · Job-site wiring
Serious$0$0Feb 2, 2010Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.404(f)(6)

(6) Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent and continuous.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(a)(2)(ii)

(2) Temporary wiring—(i) Scope. The provisions of paragraph (a)(2) of this section apply to temporary electrical power and lighting wiring methods which may be of a class less than would be required for a permanent installation. Except as specifically modified in paragraph (a)(2) of this section, all other requirements of this subpart for permanent wiring shall apply to temporary wiring installations. Temporary wiring shall be removed immediately upon completion of construction or the purpose for which the wiring was installed.

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.501(b)(13)

(13) Residential construction. Each employee engaged in residential construction activities 6 feet (1.8 m) or more above lower levels shall be protected by guardrail systems, safety net system, or personal fall arrest system unless another provision in paragraph (b) of this section provides for an alternative fall protection measure. Exception: When the employer can demonstrate that it is infeasible or creates a greater hazard to use these systems, the employer shall develop and implement a fall protection plan which meets the requirements of paragraph (k) of § 1926.502.

Other framing contractors employers in Ohio

Alert subscribers get notified of each newly cited employer in Ohio the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.