OSHA SearchOSHA records by employer

Grimsley-Tucker Inc.: OSHA inspections and violations

Corpus Christi, Texas · Electrical Contractors and Other Wiring Installation Contractors · NAICS 238210

2inspections
6citation items
$9,737current penalties
Sep 17, 2019last inspection

Grimsley-Tucker Inc. has 2 OSHA inspections on record in Texas, the first in 2015.

OSHA's last visit started on Sep 17, 2019 on a referral, in Seguin.

Across those inspections OSHA issued 6 citation items: 6 serious.

OSHA proposed $16,228 in penalties. After settlements and reviews the total is $9,737, down 40%.

Most often, OSHA cited 1910.147, lockout/tagout (5 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Grimsley-Tucker Inc. averages $9,737 over 1 cited inspection in that time.

Grimsley-Tucker Inc. also files yearly injury logs with OSHA, summarized below.

It reported 1 severe injury to OSHA since 2015.

Grimsley-Tucker Inc.: OSHA citation items per year, 2015 to 2019
Citation items per year, by inspection date.

Texas · latest 90 days of OSHA records

393employers cited

7 of them in the same industry

Get notified the morning OSHA posts each new citation in Texas: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Texas

Checking a subcontractor, a client or your own company? Watch Grimsley-Tucker Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344313424 OPENED SEP 17, 2019Closed

Referral · Partial · Safety · 44 employees at the site · Closed Nov 25, 2019

405 E. Ih10, Seguin, TX 78155 · All Other Miscellaneous Electrical Equipment and Component Manufacturing · OSHA's record · Phone and website on Google Maps

Incident on Sep 12, 2019: Employee is burned when mixture of freon and oil ignites

At 10:30 a.m. on September 12, 2019, two employees were working for a firm that provided electrical work and service. They were at a site, replacing a defective expansion valve on the site's number 5 water chiller. The chiller contained approximately 60 lbs. (27 kg.) of R-22 refrigerant, or Freon. The two workers had crawled under the chiller to place vacuum pump connections on the system, and they had pumped out the Freon from the chiller. They were taking off the R-22 Freon line to remove the expansion valve. They were heating a soldered nipple or joint on the line. One employee operated the torch, while the other helped him. Both employees were wearing T-shirts. The employee operating the torch was wearing a cotton T-shirt. The helper had pliers on the line to try to pull apart the line from the heated soldered joint. When the joint came apart, a mixture of residual Freon and oil in the line was released. A flash fire occurred, and the employee operating the torch received second-degree burns to his right arm, neck, cheek, and chest. He was hospitalized for two or more days. The safety data sheet for R-22 manufactured by Dupont notes that while R-22 is not flammable in air temperatures up to 212 degrees F (100 degrees C) at atmospheric pressure, mixtures of this substance with high concentrations of air at elevated pressure and/or temperature can become combustible. Further, the entire time the employees were working on the chiller, the 480-volt disconnect panel box on the other side of the chiller was not locked out. The employer has revised the procedure so that the line being serviced is purged with nitrogen.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.132(a) · Personal protective equipment, general requirements
Serious$4,057$2,434Oct 21, 2019Final
Citation 1, item 2a
29 CFR 1910.147(c)(7)(i) · Lockout/tagout
Serious$4,057$2,434Oct 21, 2019Final
Citation 1, item 2b
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Serious$0$0Oct 21, 2019Final
Citation 1, item 2c
29 CFR 1910.147(c)(6)(ii) · Lockout/tagout
Serious$0$0Oct 21, 2019Final
Citation 1, item 3
29 CFR 1910.147(d)(4)(i) · Lockout/tagout
Serious$4,057$2,434Oct 21, 2019Final
Citation 1, item 4
29 CFR 1910.147(d)(5)(i) · Lockout/tagout
Serious$4,057$2,434Oct 21, 2019Final

Inspection 340471572 OPENED MAR 17, 2015Closed

Referral · No inspection · Safety · 55 employees at the site · Closed Mar 20, 2015

2504 Joe Fulton International Trade Corridor, Corpus Christi, TX 78402 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2021, the Seguin site logged 3 recordable injuries or illnesses among about 44 workers: 5.9 per 100 full-time workers, against a median of 1.8 for its industry. Those cases cost 374 days away from work.

Site and yearWorkersCasesDays-away casesRateIndustry median
Industrial Electric Service
Seguin · 2021
44 335.91.8

Included with any plan: 4 more yearly logs from these sites, back to 2016, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

Severe injury reports

Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 1 report on file.

Sep 12, 2019, Seguin: Hospitalization · second degree heat (thermal) burns · multiple body parts, n.e.c.

Two employees were changing an expansion valve on an outdoor chiller unit. One employee was using a canister torch to sweat the piping and valve while the other was pulling on the pipe with a pair of pliers. When the connection came loose, excess fluid inside of the valve was ignited by the torch and splashed onto the employee with the torch. The employee suffered second-degree burns from the…

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.132 · Personal protective equipment, general requirements

29 CFR 1910.132(a)

(a) Application. Protective equipment, including personal protective equipment for eyes, face, head, and extremities, protective clothing, respiratory devices, and protective shields and barriers, shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards of processes or environment, chemical hazards, radiological hazards, or mechanical irritants encountered in a manner capable of causing injury or impairment in the function of any part of the body through absorption, inhalation or physical contact.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(6)(i)

(6) Periodic inspection. (i) The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed.

29 CFR 1910.147(c)(6)(ii)

(ii) The employer shall certify that the periodic inspections have been performed. The certification shall identify the machine or equipment on which the energy control procedure was being utilized, the date of the inspection, the employees included in the inspection, and the person performing the inspection.

Other electrical contractors and other wiring installation contractors employers in Texas

Alert subscribers get notified of each newly cited employer in Texas the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.