OSHA SearchOSHA records by employer

GTM Floor Corporation: OSHA inspections and violations

Mount Vernon, New York · Flooring Contractors · NAICS 238330

1inspections
2citation items
$4,000current penalties
Sep 8, 2016last inspection

OSHA has inspected GTM Floor Corporation once in New York.

The inspection began on Sep 8, 2016 as a planned inspection, in Mount Vernon.

That inspection ended with 2 citation items: 2 serious.

Penalties were first proposed at $5,345 and now stand at $4,000, 25% lower after settlements or reviews.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and GTM Floor Corporation averages $4,000 (1 cited inspection).

GTM Floor Corporation: OSHA citation items per year, 2016 to 2016
Citation items per year, by inspection date.

New York · latest 90 days of OSHA records

360employers cited

Get notified the morning OSHA posts each new citation in New York: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in New York

Checking a subcontractor, a client or your own company? Watch GTM Floor Corporation and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341773125 OPENED SEP 8, 2016Closed

Planned · Complete · Safety · 5 employees at the site · Closed May 31, 2017

203 Gramatan Avenue, Mount Vernon, NY 10550 · Flooring Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.304(i)(1) · Woodworking tools
Serious$3,741$2,800Sep 28, 2016Final
Citation 1, item 2
29 CFR 1926.416(e)(1) · Electrical safety in construction
Serious$1,604$1,200Sep 28, 2016Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.304 · Woodworking tools

29 CFR 1926.304(i)(1)

(i) Hand-fed ripsaws. (1) Each circular hand-fed ripsaw shall be guarded by a hood which shall completely enclose that portion of the saw above the table and that portion of the saw above the material being cut. The hood and mounting shall be arranged so that the hood will automatically adjust itself to the thickness of and remain in contact with the material being cut but it shall not offer any considerable resistance to insertion of material to saw or to passage of the material being sawed. The hood shall be made of adequate strength to resist blows and strains incidental to reasonable operation, adjusting, and handling, and shall be so designed as to protect the operator from flying splinters and broken saw teeth. It shall be made of material that is soft enough so that it will be unlikely to cause tooth breakage. The hood shall be so mounted as to insure that its operation will be po

29 CFR 1926.416 · Electrical safety in construction

29 CFR 1926.416(e)(1)

(e) Cords and cables. (1) Worn or frayed electric cords or cables shall not be used.

Other flooring contractors employers in New York

Alert subscribers get notified of each newly cited employer in New York the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.