Harvestland Constructors, Inc.: OSHA inspections and violations

Cambria, Wisconsin · Industrial Building Construction · NAICS 236210

1inspections
5citation items
$15,471current penalties
Dec 20, 2017last inspection

OSHA has inspected Harvestland Constructors, Inc. once in Wisconsin.

The inspection began on Dec 20, 2017 after a complaint, in Cambria.

That inspection ended with 5 citation items: 3 serious and 2 other-than-serious.

Penalties were first proposed at $29,936 and now stand at $15,471, 48% lower after settlements or reviews.

Scaffolds, general requirements comes up most often in these citations: 3 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Harvestland Constructors, Inc. averages $15,471 (1 cited inspection).

Harvestland Constructors, Inc.: OSHA citation items per year, 2017 to 2017
Citation items per year, by inspection date.

Wisconsin · latest 90 days of OSHA records

229employers cited

Get notified the morning OSHA posts each new citation in Wisconsin: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Wisconsin

Checking a subcontractor, a client or your own company? Watch Harvestland Constructors, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342849379 OPENED DEC 20, 2017Closed

Complaint · Partial · Safety · 231 employees at the site · Closed Jun 29, 2018

501 S. Williams Street, Cambria, WI 53923 · Industrial Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.405(a)(2)(ii)(j) · Job-site wiring
Serious$7,484$4,490Jun 8, 2018Final
Citation 1, item 2
29 CFR 1926.451(b)(1)(i) · Scaffolds, general requirements
Serious$7,484$4,490Jun 8, 2018Final
Citation 1, item 3a
29 CFR 1926.451(b)(5)(ii) · Scaffolds, general requirements
Other-than-serious$7,484$2,000Jun 8, 2018Final
Citation 1, item 3b
29 CFR 1926.451(b)(7) · Scaffolds, general requirements
Other-than-serious$0$0Jun 8, 2018Final
Citation 1, item 4
29 CFR 1926.502(d)(8) · Fall protection systems
Serious$7,484$4,490Jun 8, 2018Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(a)(2)(ii)(j)

(J) Extension cord sets used with portable electric tools and appliances shall be of three-wire type and shall be designed for hard or extra-hard usage. Flexible cords used with temporary and portable lights shall be designed for hard or extra-hard usage.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)(i)

(i) Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) shall be installed so that the space between adjacent units and the space between the platform and the uprights is no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary (for example, to fit around uprights when side brackets are used to extend the width of the platform).

29 CFR 1926.451(b)(5)(ii)

(ii) Each platform greater than 10 feet in length shall not extend over its support more than 18 inches (46 cm), unless it is designed and installed so that the cantilevered portion of the platform is able to support employees without tipping, or has guardrails which block employee access to the cantilevered end.

29 CFR 1926.502 · Fall protection systems

Other industrial building construction employers in Wisconsin

Alert subscribers get notified of each newly cited employer in Wisconsin the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.