Helmer Amaya Gomes: OSHA inspections and violations

Magnolia, Texas · Framing Contractors · NAICS 238130

1inspections
2citation items
$6,914current penalties
Apr 22, 2024last inspection

OSHA has inspected Helmer Amaya Gomes once in Texas.

The inspection began on Apr 22, 2024 as a planned inspection, in Magnolia.

That inspection ended with 2 citation items: 2 serious.

Penalties were first proposed at $6,914 and still stand at $6,914.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Helmer Amaya Gomes averages $6,914 (1 cited inspection).

Helmer Amaya Gomes: OSHA citation items per year, 2024 to 2024
Citation items per year, by inspection date.

Texas · latest 90 days of OSHA records

399employers cited

56 of them in the same industry

Get notified the morning OSHA posts each new citation in Texas: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Texas

Checking a subcontractor, a client or your own company? Watch Helmer Amaya Gomes and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347428815 OPENED APR 22, 2024Closed

Planned · Partial · Safety · 2 employees at the site · Closed Nov 17, 2026

6407 Pine Heights Dr., Magnolia, TX 77354 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$3,457$3,457May 9, 2024Final
Citation 1, item 2
29 CFR 1926.452(j)(2) · Rules for each type of scaffold
Serious$3,457$3,457May 9, 2024Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(c)(2)

(2) Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation.

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.452(j)(2)

(2) Poles shall be secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. When the pump jack has to pass bracing already installed, an additional brace shall be installed approximately 4 feet (1.2 m) above the brace to be passed, and shall be left in place until the pump jack has been moved and the original brace reinstalled.

Other framing contractors employers in Texas

Alert subscribers get notified of each newly cited employer in Texas the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.