OSHA SearchOSHA records by employer

Hillcrest Construction & Development LLC: OSHA inspections and violations

Government Camp, Oregon · Sporting Goods Stores · NAICS 451110

1inspections
3citation items
$200current penalties
Apr 10, 2023last inspection

OSHA has inspected Hillcrest Construction & Development LLC once in Oregon.

The inspection began on Apr 10, 2023 after a complaint, in Government Camp; the case is still open.

That inspection ended with 3 citation items: 2 serious and 1 other-than-serious.

Penalties were first proposed at $200 and still stand at $200.

How that compares: the median penalty per cited inspection for retail employers since 2015 is $2,135, and Hillcrest Construction & Development LLC averages $200 (1 cited inspection).

Hillcrest Construction & Development LLC: OSHA citation items per year, 2023 to 2023
Citation items per year, by inspection date.

Oregon · latest 90 days of OSHA records

388employers cited

Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Oregon

Checking a subcontractor, a client or your own company? Watch Hillcrest Construction & Development LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 346708076 OPENED APR 10, 2023Open

Complaint · Partial · Safety · 3 employees at the site · Open

88510 E Government Camp Loop, Government Camp, OR 97028 · Sporting Goods Stores · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.305(b)(2)(i) · Electrical wiring methods
Serious$100$100May 30, 2023Final
Citation 1, item 2 Serious$100$100May 30, 2023Final
Citation 2, item 3
29 CFR 1910.303(g)(1)(ii) · Electrical equipment, general requirements
Other-than-serious$0$0May 30, 2023Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.25 · Stairways

29 CFR 1910.25(b)(1)

(1) Handrails, stair rail systems, and guardrail systems are provided in accordance with § 1910.28;

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.303(g)(1)(ii)

(ii) Working space required by this standard may not be used for storage. When normally enclosed live parts are exposed for inspection or servicing, the working space, if in a passageway or general open space, shall be suitably guarded.

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.305(b)(2)(i)

(2) Covers and canopies. (i) All pull boxes, junction boxes, and fittings shall be provided with covers identified for the purpose. If metal covers are used, they shall be grounded. In completed installations, each outlet box shall have a cover, faceplate, or fixture canopy. Covers of outlet boxes having holes through which flexible cord pendants pass shall be provided with bushings designed for the purpose or shall have smooth, well-rounded surfaces on which the cords may bear.

Other sporting goods stores employers in Oregon

Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.