OSHA SearchOSHA records by employer

Hixson Utility-Administration: OSHA inspections and violations

Hixson, Tennessee · Water Supply and Irrigation Systems · NAICS 221310

4inspections
10citation items
$0current penalties
Mar 24, 2015last inspection

Since 2008, OSHA inspectors have visited Hixson Utility-Administration in Tennessee 4 times.

The most recent inspection opened on Mar 24, 2015 as a planned inspection, in Hixson.

In all, OSHA issued 10 citation items: 10 serious.

No penalty came with these citations.

The rule cited most here is 1910.305 (electrical wiring methods), 3 times.

Among utility employers, the typical cited inspection since 2015 ends with a $0 penalty. Hixson Utility-Administration averages $0 across 1 cited inspection.

Hixson Utility-Administration: OSHA citation items per year, 2008 to 2015
Citation items per year, by inspection date.

Tennessee · latest 90 days of OSHA records

344employers cited

16 of them in the same industry

Get notified the morning OSHA posts each new citation in Tennessee: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Tennessee

Checking a subcontractor, a client or your own company? Watch Hixson Utility-Administration and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 340515063 OPENED MAR 24, 2015Closed

Planned · Complete · Safety · Local government · 10 employees at the site · Closed May 11, 2015

5201 Hixson Pike, Hixson, TN 37343 · Water Supply and Irrigation Systems · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.304(g)(5) · Grounding and circuit protection
Serious$0$0Apr 30, 2015Final
Citation 1, item 2
29 CFR 1910.305(b)(2)(i) · Electrical wiring methods
Serious$0$0Apr 30, 2015Final
Citation 1, item 3
29 CFR 1910.305(g)(1)(iv) · Electrical wiring methods
Serious$0$0Apr 30, 2015Final

Inspection 316627090 OPENED JUL 3, 2012Closed

Planned · Complete · Safety · Local government · 23 employees at the site · Closed Nov 30, 2012

5201 Hixson Pike, Hixson, TN 37343 · Water Supply and Irrigation Systems · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.21(b)(2) · Construction safety training
Serious$0$0Aug 23, 2012Closed
Citation 1, item 2
29 CFR 1926.100(a) · Hard hats in construction
Serious$0$0Aug 23, 2012Closed
Citation 1, item 3
29 CFR 1926.651(j)(2) · Excavations
Serious$0$0Aug 23, 2012Closed
Citation 1, item 4
29 CFR 1926.651(k)(1) · Excavations
Serious$0$0Aug 23, 2012Closed
Citation 1, item 5
29 CFR 1926.652(a)(1) · Trench protection
Serious$0$0Aug 23, 2012Closed
Citation 1, item 6
29 CFR 1926.1053(b)(1) · Ladders in construction
Serious$0$0Aug 23, 2012Closed

Inspection 316069624 OPENED SEP 21, 2011Closed

Planned · Complete · Safety · Local government · 9 employees at the site · Closed Oct 24, 2011

5201 Hixson Pike, Hixson, TN 37343 · Water Supply and Irrigation Systems · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.305(g)(1)(iv) · Electrical wiring methods
Serious$0$0Oct 5, 2011Closed

Inspection 312235351 OPENED MAY 9, 2008Closed

Planned · No inspection · Safety · Local government · 9 employees at the site · Closed May 9, 2008

5201 Hixson Pike, Hixson, TN 37343 · Water Supply and Irrigation Systems · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.304 · Grounding and circuit protection

29 CFR 1910.304(g)(5)

(5) Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent, continuous, and effective.

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.305(b)(2)(i)

(2) Covers and canopies. (i) All pull boxes, junction boxes, and fittings shall be provided with covers identified for the purpose. If metal covers are used, they shall be grounded. In completed installations, each outlet box shall have a cover, faceplate, or fixture canopy. Covers of outlet boxes having holes through which flexible cord pendants pass shall be provided with bushings designed for the purpose or shall have smooth, well-rounded surfaces on which the cords may bear.

29 CFR 1910.305(g)(1)(iv)

(iv) Unless specifically permitted otherwise in paragraph (g)(1)(ii) of this section, flexible cords and cables may not be used:

29 CFR 1926.100 · Hard hats in construction

29 CFR 1926.1053 · Ladders in construction

29 CFR 1926.21 · Construction safety training

29 CFR 1926.651 · Excavations

29 CFR 1926.652 · Trench protection

Other water supply and irrigation systems employers in Tennessee

Alert subscribers get notified of each newly cited employer in Tennessee the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.