OSHA SearchOSHA records by employer

Hodgman Drainage Company Inc: OSHA inspections and violations

Waltham, Minnesota · Water and Sewer Line and Related Structures Construction · NAICS 237110

4inspections
10citation items
$8,720current penalties
Jun 18, 2025last inspection

Hodgman Drainage Company Inc has 4 OSHA inspections on record in Minnesota, the first in 2003.

OSHA's last visit started on Jun 18, 2025 as a planned inspection, in Kenyon.

Across those inspections OSHA issued 10 citation items: 9 serious and 1 other-than-serious.

OSHA proposed $15,100 in penalties. After settlements and reviews the total is $8,720, down 42%.

Most often, OSHA cited 1926.652, trench protection (3 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Hodgman Drainage Company Inc averages $3,810 over 2 cited inspections in that time.

Hodgman Drainage Company Inc: OSHA citation items per year, 2003 to 2025
Citation items per year, by inspection date.

Minnesota · latest 90 days of OSHA records

364employers cited

10 of them in the same industry

Get notified the morning OSHA posts each new citation in Minnesota: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Minnesota

Checking a subcontractor, a client or your own company? Watch Hodgman Drainage Company Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348326232 OPENED JUN 18, 2025Closed

Planned · Complete · Safety · 9 employees at the site · Closed Jul 29, 2025

1102 Hwy 60 Blvd, Kenyon, MN 55946 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.652(a)(1) · Trench protection
Serious$2,200$1,320Jul 2, 2025Final
Citation 1, item 2
29 CFR 1926.1053(b)(1) · Ladders in construction
Serious$600$360Jul 2, 2025Final

Inspection 347702144 OPENED AUG 20, 2024Closed

Planned · Complete · Safety · 5 employees at the site · Closed Feb 25, 2025

500 3rd St Se, Hayfield, MN 55940 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 2
29 CFR 1926.21(b)(2) · Construction safety training
Other-than-serious$2,700$1,620Sep 17, 2024Final
Citation 1, item 3
29 CFR 1926.651(c)(2) · Excavations
Serious$2,700$1,620Sep 17, 2024Final
Citation 1, item 4
29 CFR 1926.651(j)(2) · Excavations
Serious$1,800$1,080Sep 17, 2024Final
Citation 1, item 5
29 CFR 1926.652(a)(1) · Trench protection
Serious$2,700$1,620Sep 17, 2024Final

Inspection 309310811 OPENED SEP 21, 2005Closed

Complaint · Partial · Safety · 5 employees at the site · Closed Jan 25, 2006

Hwy 63 West, Lake City, MN 55041 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.651(j)(2) · Excavations
Serious$400$300Oct 6, 2005Final
Citation 1, item 2
29 CFR 1926.652(a)(1) · Trench protection
Serious$1,000$300Oct 6, 2005Final

Inspection 306761321 OPENED AUG 18, 2003Closed

Planned · Partial · Safety · 4 employees at the site · Closed Mar 1, 2004

Columbus St, Waltham, MN 55982 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$1,000$500Sep 24, 2003Final
Citation 1, item 2 Serious$0$0Sep 24, 2003Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1820.6530

29 CFR 1926.1053 · Ladders in construction

29 CFR 1926.1053(b)(1)

(1) When portable ladders are used for access to an upper landing surface, the ladder side rails shall extend at least 3 feet (.9 m) above the upper landing surface to which the ladder is used to gain access; or, when such an extension is not possible because of the ladder's length, then the ladder shall be secured at its top to a rigid support that will not deflect, and a grasping device, such as a grabrail, shall be provided to assist employees in mounting and dismounting the ladder. In no case shall the extension be such that ladder deflection under a load would, by itself, cause the ladder to slip off its support.

29 CFR 1926.21 · Construction safety training

29 CFR 1926.21(b)(2)

(2) The employer shall instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his work environment to control or eliminate any hazards or other exposure to illness or injury.

29 CFR 1926.651 · Excavations

29 CFR 1926.651(c)(2)

(2) Means of egress from trench excavations. A stairway, ladder, ramp or other safe means of egress shall be located in trench excavations that are 4 feet (1.22 m) or more in depth so as to require no more than 25 feet (7.62 m) of lateral travel for employees.

29 CFR 1926.652 · Trench protection

Other water and sewer line and related structures construction employers in Minnesota

Alert subscribers get notified of each newly cited employer in Minnesota the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.