OSHA SearchOSHA records by employer

Homestead West Construction Inc: OSHA inspections and violations

Holladay, Utah · New Housing For-Sale Builders · NAICS 236117

1inspections
2citation items
$750current penalties
Sep 28, 2015last inspection

Homestead West Construction Inc has one OSHA inspection on record in Utah.

OSHA opened it on Sep 28, 2015 on a referral, in Holladay.

From that inspection OSHA issued 2 citation items: 2 serious.

OSHA proposed $1,500 in penalties. After settlements and reviews the total is $750, down 50%.

Most often, OSHA cited 1926.451, scaffolds, general requirements (2 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Homestead West Construction Inc averages $750 over 1 cited inspection in that time.

Homestead West Construction Inc: OSHA citation items per year, 2015 to 2015
Citation items per year, by inspection date.

Utah · latest 90 days of OSHA records

73employers cited

Get notified the morning OSHA posts each new citation in Utah: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Utah

Checking a subcontractor, a client or your own company? Watch Homestead West Construction Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 340949346 OPENED SEP 28, 2015Closed

Referral · Partial · Safety · 2 employees at the site · Closed Mar 4, 2016

4644 South Holliday Blvd., Holladay, UT 84117 · New Housing For-Sale Builders · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$1,500$750Dec 7, 2015Final
Citation 1, item 1b
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$0$0Dec 7, 2015Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(e)(1)

(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.

Other new housing for-sale builders employers in Utah

Alert subscribers get notified of each newly cited employer in Utah the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.