OSHA SearchOSHA records by employer

Horizon Builders LLC: OSHA inspections and violations

Terrebonne, Oregon · Framing Contractors · NAICS 238130

4inspections
9citation items
$3,032current penalties
Apr 22, 2024last inspection

Since 2004, OSHA inspectors have visited Horizon Builders LLC in Oregon 4 times.

The most recent inspection opened on Apr 22, 2024 as a planned inspection, in Bend and is still open.

In all, OSHA issued 9 citation items: 4 serious and 5 other-than-serious.

The proposed penalties came to $3,082; today they stand at $3,032, 2% less.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Horizon Builders LLC averages $2,882 across 1 cited inspection.

Horizon Builders LLC: OSHA citation items per year, 2004 to 2024
Citation items per year, by inspection date.

Oregon · latest 90 days of OSHA records

388employers cited

3 of them in the same industry

Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Oregon

Checking a subcontractor, a client or your own company? Watch Horizon Builders LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347432155 OPENED APR 22, 2024Open

Planned · Partial · Safety · 2 employees at the site · Open

2638 Waymaker Ct, Bend, OR 97703 · New Single-Family Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-003-1501(1)
Serious$1,729$1,729Jul 2, 2024Final
Citation 1, item 2
29 CFR 1926.1060(a) · Ladder and stairway training
Serious$1,153$1,153Jul 2, 2024Final
Citation 2, item 3
29 CFR OAR 437-001-0765(11)-1
Other-than-serious$0$0Jul 2, 2024Final
Citation 2, item 4
29 CFR OAR 437-003-0503(2)(A)-1
Other-than-serious$0$0Jul 2, 2024Final

Inspection 315926790 OPENED MAY 23, 2012Closed

Accident · Partial · Safety · 3 employees at the site · Closed Aug 30, 2012

27208 Ne Old Wolf Creek Rd, Prineville, OR 97754 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Incident on May 21, 2012: Employee falls off a roof and sustains fracture

On May 21, 2012, Employee #1, with Horizon Builders Inc., was installing a tarp on an unfinished roof as waterproofing, and he stepped onto the other side of th e roof and slipped and fell 15 feet to the lower ground. Employee #1 was not wea ring fall protection. He was hospitalized with an unspecified fracture.

No citations from this inspection.

Inspection 311205876 OPENED JAN 3, 2008Closed

Planned · Partial · Safety · 6 employees at the site · Closed May 19, 2008

2045 Sw Deerhound Ave, Redmond, OR 97756 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.453(b)(2)(v) · Aerial lifts
Serious$100$100Feb 12, 2008Closed

Inspection 308132380 OPENED DEC 3, 2004Closed

Planned · Complete · Safety · 2 employees at the site · Closed May 19, 2005

70120 Nw 93rd St, Terrebonne, OR 97760 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.300(b)(1) · Tools—Hand and Power: general requirements
Serious$100$50Dec 30, 2004Final
Citation 2, item 2
29 CFR 1926.404(f)(6) · Ground-fault protection on job sites
Other-than-serious$0$0Dec 30, 2004Final
Citation 2, item 3
29 CFR 1926.405(g)(2)(iv) · Job-site wiring
Other-than-serious$0$0Dec 30, 2004Final
Citation 2, item 4
29 CFR 1926.1051(a) · Stairways and Ladders: general requirements
Other-than-serious$0$0Dec 30, 2004Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1051 · Stairways and Ladders: general requirements

29 CFR 1926.1051(a)

(a) A stairway or ladder shall be provided at all personnel points of access where there is a break in elevation of 19 inches (48 cm) or more, and no ramp, runway, sloped embankment, or personnel hoist is provided.

29 CFR 1926.1060 · Ladder and stairway training

29 CFR 1926.1060(a)

(a) The employer shall provide a training program for each employee using ladders and stairways, as necessary. The program shall enable each employee to recognize hazards related to ladders and stairways, and shall train each employee in the procedures to be followed to minimize these hazards.

29 CFR 1926.300 · Tools—Hand and Power: general requirements

29 CFR 1926.300(b)(1)

(b) Guarding. (1) When power operated tools are designed to accommodate guards, they shall be equipped with such guards when in use.

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.453 · Aerial lifts

Other framing contractors employers in Oregon

Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.