OSHA SearchOSHA records by employer

Huffman Construction, LLC: OSHA inspections and violations

Amherst, Ohio · Other Building Finishing Contractors · NAICS 238390

4inspections
11citation items
$4,790current penalties
Jul 11, 2019last inspection

Since 2010, OSHA inspectors have visited Huffman Construction, LLC in Ohio 4 times.

The most recent inspection opened on Jul 11, 2019 after a complaint, in Cleveland.

In all, OSHA issued 11 citation items: 11 serious.

The proposed penalties came to $12,400; today they stand at $4,790, 61% less.

The rule cited most here is 1926.451 (scaffolds, general requirements), 8 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Huffman Construction, LLC averages $1,700 across 1 cited inspection.

Huffman Construction, LLC: OSHA citation items per year, 2010 to 2019
Citation items per year, by inspection date.

Ohio · latest 90 days of OSHA records

275employers cited

Get notified the morning OSHA posts each new citation in Ohio: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Ohio

Checking a subcontractor, a client or your own company? Watch Huffman Construction, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344156617 OPENED JUL 11, 2019Closed

Complaint · Complete · Safety · 10 employees at the site · Closed Sep 12, 2019

11905 Mayfield Road, Cleveland, OH 44109 · Other Building Finishing Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 340930650 OPENED SEP 17, 2015Closed

Planned · Partial · Safety · 20 employees at the site · Closed Nov 7, 2016

201 Market Street, Westlake, OH 44145 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$2,800$1,700Oct 20, 2015Final
Citation 1, item 1b
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$0$0Oct 20, 2015Final
Citation 1, item 1c
29 CFR 1926.451(e)(7) · Scaffolds, general requirements
Serious$0$0Oct 20, 2015Final
Citation 1, item 1d
29 CFR 1926.451(f)(7) · Scaffolds, general requirements
Serious$0$0Oct 20, 2015Final
Citation 1, item 1e
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$0$0Oct 20, 2015Final

Inspection 331101626 OPENED DEC 12, 2011Closed

Planned · Complete · Safety · 10 employees at the site · Closed Sep 10, 2014

32936 Center Ridge Rd., North Ridgeville, OH 44039 · Other Building Finishing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.501(b)(1) · Fall protection in construction
Serious$4,200$2,250Jan 6, 2012Final
Citation 1, item 1b
29 CFR 1926.503(a)(1) · Fall protection training in construction
Serious$4,200$0Jan 6, 2012Final

Inspection 314382706 OPENED APR 9, 2010Closed

Referral · Partial · Safety · 5 employees at the site · Closed May 24, 2010

7498 Leavitt Rd., Amherst, OH 44001 · Other Building Finishing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(b)(1)(i) · Scaffolds, general requirements
Serious$600$420Apr 29, 2010Closed
Citation 1, item 1b
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$0$0Apr 29, 2010Closed
Citation 1, item 1c
29 CFR 1926.451(f)(7) · Scaffolds, general requirements
Serious$0$0Apr 29, 2010Closed
Citation 1, item 2
29 CFR 1926.1053(b)(13) · Ladders in construction
Serious$600$420Apr 29, 2010Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1053 · Ladders in construction

29 CFR 1926.1053(b)(13)

(13) The top or top step of a stepladder shall not be used as a step.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(b)(1)(i)

(i) Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) shall be installed so that the space between adjacent units and the space between the platform and the uprights is no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary (for example, to fit around uprights when side brackets are used to extend the width of the platform).

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.503 · Fall protection training in construction

Other other building finishing contractors employers in Ohio

Alert subscribers get notified of each newly cited employer in Ohio the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.