OSHA SearchOSHA records by employer

Ibarra Construction: OSHA inspections and violations

Laredo, Texas · Siding Contractors · NAICS 238170

1inspections
4citation items
$7,458current penalties
Feb 2, 2022last inspection

OSHA has inspected Ibarra Construction once in Texas.

The inspection began on Feb 2, 2022 as a planned inspection, in Laredo.

That inspection ended with 4 citation items: 4 serious.

Penalties were first proposed at $7,458 and still stand at $7,458.

Scaffolds, general requirements comes up most often in these citations: 4 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,079, and Ibarra Construction averages $7,458 (1 cited inspection).

Ibarra Construction: OSHA citation items per year, 2022 to 2022
Citation items per year, by inspection date.

Want to know if OSHA cites Ibarra Construction again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 345762322 OPENED FEB 2, 2022Closed

Planned · Partial · Safety · 3 employees at the site · Closed Sep 25, 2024

936 La Rosita Dr, Laredo, TX 78046 · Siding Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$2,486$2,486May 12, 2022Final
Citation 1, item 2a
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$2,486$2,486May 12, 2022Final
Citation 1, item 2b
29 CFR 1926.451(c)(2)(i) · Scaffolds, general requirements
Serious$0$0May 12, 2022Final
Citation 1, item 3
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$2,486$2,486May 12, 2022Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(c)(2)

(2) Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation.

29 CFR 1926.451(c)(2)(i)

(i) Footings shall be level, sound, rigid, and capable of supporting the loaded scaffold without settling or displacement.

Other siding contractors employers in Texas

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.