OSHA SearchOSHA records by employer

In Phaze Electric Inc: OSHA inspections and violations

Orlando, Florida · Electrical Contractors and Other Wiring Installation Contractors · NAICS 238210

1inspections
2citation items
$8,750current penalties
Jan 25, 2023last inspection

OSHA has inspected In Phaze Electric Inc once in Florida.

The inspection began on Jan 25, 2023 after a complaint, in Orlando.

That inspection ended with 2 citation items: 2 serious.

Penalties were first proposed at $12,500 and now stand at $8,750, 30% lower after settlements or reviews.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and In Phaze Electric Inc averages $8,750 (1 cited inspection).

In Phaze Electric Inc: OSHA citation items per year, 2023 to 2023
Citation items per year, by inspection date.

Florida · latest 90 days of OSHA records

320employers cited

4 of them in the same industry

Get notified the morning OSHA posts each new citation in Florida: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Florida

Checking a subcontractor, a client or your own company? Watch In Phaze Electric Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 346458078 OPENED JAN 25, 2023Closed

Complaint · Partial · Safety · 22 employees at the site · Closed Feb 13, 2024

2100 Consulate Dr, Orlando, FL 32837 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.333(a)(1) · Working near live electrical parts
Serious$6,250$4,375Jul 21, 2023Final
Citation 1, item 2
29 CFR 1910.335(a)(2)(i) · Safeguards for personnel protection
Serious$6,250$4,375Jul 21, 2023Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.333 · Working near live electrical parts

29 CFR 1910.333(a)(1)

(1) Deenergized parts. Live parts to which an employee may be exposed shall be deenergized before the employee works on or near them, unless the employer can demonstrate that deenergizing introduces additional or increased hazards or is infeasible due to equipment design or operational limitations. Live parts that operate at less than 50 volts to ground need not be deenergized if there will be no increased exposure to electrical burns or to explosion due to electric arcs.

29 CFR 1910.335 · Safeguards for personnel protection

29 CFR 1910.335(a)(2)(i)

(2) General protective equipment and tools. (i) When working near exposed energized conductors or circuit parts, each employee shall use insulated tools or handling equipment if the tools or handling equipment might make contact with such conductors or parts. If the insulating capability of insulated tools or handling equipment is subject to damage, the insulating material shall be protected.

Other electrical contractors and other wiring installation contractors employers in Florida

Alert subscribers get notified of each newly cited employer in Florida the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.