Inspection 342082260 OPENED FEB 3, 2017Closed
1649 South Salina Street, Syracuse, NY 13205 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Since 2016, OSHA inspectors have visited Infinity Enterprises in New York 4 times.
The most recent inspection opened on Feb 3, 2017 to follow up on an earlier case, in Syracuse.
In all, OSHA issued 6 citation items: 4 serious and 2 repeat.
The penalties, $22,332 in total, stand where OSHA first set them.
The rule cited most here is 1926.859 (mechanical demolition), 3 times.
Among construction employers, the typical cited inspection since 2015 ends with a $3,078 penalty. Infinity Enterprises averages $11,166 across 2 cited inspections.
Want to know if OSHA cites Infinity Enterprises again? Add it to a watchlist and we will email you the morning the citation shows up.
Watch this company1649 South Salina Street, Syracuse, NY 13205 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
555 South 4th Street, Fulton, NY 13069 · Remediation Services · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.850(a) · Preparatory operations |
Repeat | $8,366 | $8,366 | Feb 10, 2017 | Final |
| Citation 1, item 2 29 CFR 1926.859(a) · Mechanical demolition |
Repeat | $8,366 | $8,366 | Feb 10, 2017 | Final |
43 Kelly Road, Fulton, NY 13069 · Other Heavy and Civil Engineering Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
1649 South Salina Street, Syracuse, NY 13205 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.850(a) · Preparatory operations |
Serious | $2,800 | $2,800 | Jun 16, 2016 | Final |
| Citation 1, item 2a 29 CFR 1926.854(b) · Removal of walls, masonry sections, and chimneys |
Serious | $2,800 | $2,800 | Jun 16, 2016 | Final |
| Citation 1, item 2b 29 CFR 1926.859(a) · Mechanical demolition |
Serious | $0 | $0 | Jun 16, 2016 | Final |
| Citation 1, item 2c 29 CFR 1926.859(g) · Mechanical demolition |
Serious | $0 | $0 | Jun 16, 2016 | Final |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1926.850(a)
(a) Prior to permitting employees to start demolition operations, an engineering survey shall be made, by a competent person, of the structure to determine the condition of the framing, floors, and walls, and possibility of unplanned collapse of any portion of the structure. Any adjacent structure where employees may be exposed shall also be similarly checked. The employer shall have in writing evidence that such a survey has been performed.
29 CFR 1926.854(b)
(b) No wall section, which is more than one story in height, shall be permitted to stand alone without lateral bracing, unless such wall was originally designed and constructed to stand without such lateral support, and is in a condition safe enough to be self-supporting. All walls shall be left in a stable condition at the end of each shift.
29 CFR 1926.859(a)
(a) No workers shall be permitted in any area, which can be adversely affected by demolition operations, when balling or clamming is being performed. Only those workers necessary for the performance of the operations shall be permitted in this area at any other time.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.