OSHA SearchOSHA records by employer

Integrity Painting Inc: OSHA inspections and violations

Clackamas, Oregon · Painting and Wall Covering Contractors · NAICS 238320

13inspections
17citation items
$49,815current penalties
Jul 23, 2025last inspection

OSHA has inspected Integrity Painting Inc 13 times in Oregon since 2010.

The latest one began on Jul 23, 2025 as a planned inspection, in Hillsboro; the case is still open.

Those inspections ended with 17 citation items: 10 serious, 4 repeat and 3 other-than-serious.

Penalties were first proposed at $81,892 and now stand at $49,815, 39% lower after settlements or reviews.

Ladders in construction comes up most often in these citations: 7 items under 1926.1053.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Integrity Painting Inc averages $6,850 (7 cited inspections).

Integrity Painting Inc also files yearly injury logs with OSHA, summarized below.

Integrity Painting Inc: OSHA citation items per year, 2010 to 2025
Citation items per year, by inspection date.

Oregon · latest 90 days of OSHA records

388employers cited

10 of them in the same industry

Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Oregon

Checking a subcontractor, a client or your own company? Watch Integrity Painting Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348392085 OPENED JUL 23, 2025Open

Planned · Partial · Safety · 128 employees at the site · Open

5332 Se 77th Ave, Hillsboro, OR 97123 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-003-1501(1)
Repeat$47,077$15,000Aug 13, 2025Final

Inspection 347575300 OPENED JUN 12, 2024Closed

Planned · Partial · Safety · 109 employees at the site · Closed Aug 22, 2026

At/around 3428 Se 36th Str Lot #40, Gresham, OR 97080 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.1053(b)(1) · Ladders in construction
Serious$2,420$2,420Jul 24, 2024Final
Citation 1, item 2
29 CFR OAR 437-003-1501(1)
Serious$2,420$2,420Jul 24, 2024Final
Citation 1, item 3
29 CFR OAR 437-003-0503(1)(B)(H)
Serious$2,420$2,420Jul 24, 2024Final

Inspection 344181250 OPENED JUL 24, 2019Closed

Planned · Partial · Safety · 2 employees at the site · Closed Dec 24, 2019

5187 Gemeni Ave Ne, Salem, OR 97305 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-003-1501(1)
Repeat$12,250$12,250Aug 13, 2019Final

Inspection 342488400 OPENED JUN 14, 2017Closed

Planned · Partial · Safety · 90 employees at the site · Closed Jan 17, 2018

8505 Sw Schmidt Loop, Tigard, OR 97224 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.1053(b)(7) · Ladders in construction
Serious$2,100$2,100Sep 14, 2017Final
Citation 2, item 2
29 CFR OAR 437-003-1501(1)
Repeat$2,520$2,520Sep 14, 2017Final
Citation 2, item 3
29 CFR 1926.1053(b)(1) · Ladders in construction
Repeat$6,300$6,300Sep 14, 2017Final

Inspection 342022720 OPENED JAN 5, 2017Closed

Planned · Partial · Safety · 3 employees at the site · Closed Sep 27, 2017

Mckinley St, Gresham, OR 97080 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-003-1501(1)
Serious$1,470$1,470Apr 28, 2017Final

Inspection 341087286 OPENED NOV 30, 2015Closed

Planned · Partial · Safety · 5 employees at the site · Closed May 31, 2016

28463-28489 Sw Villebois Dr N Bldg 1, Wilsonville, OR 97070 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.1053(b)(1) · Ladders in construction
Serious$1,050$1,050Dec 22, 2015Final

Inspection 340786896 OPENED MAR 5, 2015Closed

Referral · Partial · Health · 75 employees at the site · Closed Nov 13, 2015

15814 Se 114th Ave, Clackamas, OR 97015 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.134(e)(1) · Respiratory protection
Other-than-serious$0$0Jul 21, 2015Final

Inspection 340547959 OPENED FEB 20, 2015Closed

Planned · Complete · Safety · 85 employees at the site · Closed Feb 20, 2015

7933 Sw Frammy Way, Hillsboro, OR 97124 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

5 older inspections

Inspection 317345908 OPENED FEB 28, 2014Closed

Planned · Complete · Safety · 70 employees at the site · Closed Feb 28, 2014

15814 Se 114th Ave, Clackamas, OR 97015 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 317342202 OPENED DEC 17, 2013Closed

Accident · Partial · Safety · 70 employees at the site · Closed Aug 27, 2014

15814 Se 114th Ave, Clackamas, OR 97015 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

Incident on Jan 10, 2014: Painter falls from stepladder and fractures knee

On January 10, 2014, Employee #1, of Integrity Painting, Inc., was working at a residence, preparing the building's exterior for painting. He was masking off a first floor window while standing on a 4-foot stepladder. As Employee #1 descend ed from the stepladder's second rung, he lost his balance and fell to the ground . Emergency services were called, and Employee #1 was transported to the hospita l, where he was admitted and treated for a fractured knee.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Other-than-serious$500$500May 15, 2014Closed

Inspection 316424803 OPENED MAY 15, 2012Closed

Planned · Partial · Safety · 4 employees at the site · Closed Sep 18, 2012

7302 Sw 180th Terrace, Beaverton, OR 97007 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 7031501
Serious$625$625Jun 7, 2012Closed
Citation 1, item 2
29 CFR 1926.1053(b)(1) · Ladders in construction
Serious$375$375Jun 7, 2012Closed
Citation 2, item 3 Other-than-serious$165$165Jun 7, 2012Closed

Inspection 314968165 OPENED OCT 15, 2010Closed

Planned · Partial · Safety · 50 employees at the site · Closed Feb 22, 2011

1338 Ne 106th Ave, Portland, OR 97220 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.1053(b)(4) · Ladders in construction
Serious$100$100Nov 8, 2010Closed

Inspection 314518275 OPENED MAY 21, 2010Closed

Planned · Partial · Safety · 40 employees at the site · Closed Nov 16, 2010

2644 Sw 50th, Redmond, OR 97756 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.1053(b)(13) · Ladders in construction
Serious$100$100Jul 22, 2010Closed

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the Clackamas site logged 2 recordable injuries or illnesses among about 100 workers: 1.8 per 100 full-time workers, against a median of 2.3 for its industry. Those cases cost 5 days away from work.

Site and yearWorkersCasesDays-away casesRateIndustry median
Integrity Painting, Inc
Clackamas · 2025
100 221.82.3
Integrity Construction Group, Inc
Clackamas · 2025
55 111.32.8

Included with any plan: 6 more yearly logs from these sites, back to 2021, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(e)(1)

(1) General. The employer shall provide a medical evaluation to determine the employee's ability to use a respirator, before the employee is fit tested or required to use the respirator in the workplace. The employer may discontinue an employee's medical evaluations when the employee is no longer required to use a respirator.

29 CFR 1926.1053 · Ladders in construction

29 CFR 1926.1053(b)(1)

(1) When portable ladders are used for access to an upper landing surface, the ladder side rails shall extend at least 3 feet (.9 m) above the upper landing surface to which the ladder is used to gain access; or, when such an extension is not possible because of the ladder's length, then the ladder shall be secured at its top to a rigid support that will not deflect, and a grasping device, such as a grabrail, shall be provided to assist employees in mounting and dismounting the ladder. In no case shall the extension be such that ladder deflection under a load would, by itself, cause the ladder to slip off its support.

29 CFR 1926.1053(b)(13)

(13) The top or top step of a stepladder shall not be used as a step.

29 CFR 7010.7002

29 CFR 7030.5030

Other painting and wall covering contractors employers in Oregon

Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.