OSHA SearchOSHA records by employer

Inter Contracting Corp.: OSHA inspections and violations

College Point, New York · Site Preparation Contractors · NAICS 238910

5inspections
7citation items
$18,957current penalties
Jan 18, 2023last inspection

Inter Contracting Corp. has 5 OSHA inspections on record in New York, the first in 2007.

OSHA's last visit started on Jan 18, 2023 on a referral, in Brooklyn, and the case has not closed yet.

Across those inspections OSHA issued 7 citation items: 6 serious and 1 other-than-serious.

OSHA proposed $23,637 in penalties. After settlements and reviews the total is $18,957, down 20%.

Most often, OSHA cited 1926.651, excavations (4 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,078. Inter Contracting Corp. averages $7,138 over 2 cited inspections in that time.

Inter Contracting Corp. also files yearly injury logs with OSHA, summarized below.

It reported 2 severe injuries to OSHA since 2015.

Inter Contracting Corp.: OSHA citation items per year, 2007 to 2023
Citation items per year, by inspection date.

Want to know if OSHA cites Inter Contracting Corp. again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 346441959 OPENED JAN 18, 2023Open

Referral · Partial · Safety · 7 employees at the site · Open

90 8th Avenue, Brooklyn, NY 11215 · Construction and Mining (except Oil Well) Machinery and Equipment Merchant Wholesalers · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.651(h)(1) · Excavations
Serious$7,813$7,813Jul 7, 2023Contested

Inspection 342141074 OPENED FEB 28, 2017Closed

Referral · Partial · Safety · 30 employees at the site · Closed Jul 13, 2017

Poppenhusen Ave & College Pl, College Point, NY 11356 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps

Incident on Feb 7, 2017: Worker is struck by falling skidder bucket and sustains foot

At 11:45 a.m. on February 7, 2017, Employee #1 and Coworker #1, employed by a construction contractor, were engaged in excavation work at a sewer/water treatment plant. Employee #1 was changing the attachment from a skid steer as Coworker #1 operated the skid steer. Employee #1 disconnected hydraulic hoses and two levers from the skid steer. Coworker #1 raised the skid steer bucket approximately 3 to 4 feet from street level and tried to loosen the bucket. The bucket fell and struck Employee #1's left foot. Emergency services were called, and Employee #1 was transported to the hospital. He was admitted and treated for a fractured left foot.

No citations from this inspection.

Inspection 342144524 OPENED FEB 28, 2017Closed

Referral · Partial · Safety · 30 employees at the site · Closed Jul 31, 2017

South-west Corner Of 9th Ave & 119st Street, College Point, NY 11356 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps

Incident on Feb 27, 2017: Worker sustains fractured ankle in trench cave-in

At 4:45 p.m. on February 27, 2017, an employee was working for a firm engaged in highway, street, and bridge construction. He was in an unprotected trench. It was approximately 2.4 meters by 1.5 meters by 1.7 meters (8 feet by 5 feet by 5 feet, 6 inches) in size. He was shoveling dirt around a gas main pipe. A partial cave-in of the trench occurred. The employee was struck by concrete and asphalt, and he sustained a fractured left ankle. The employee was hospitalized for his injuries.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.651(i)(1) · Excavations
Other-than-serious$6,464$6,464Jun 12, 2017Final

Inspection 314977307 OPENED MAR 15, 2011Closed

Complaint · Complete · Safety · 13 employees at the site · Closed Aug 7, 2012

Lafayette Ave Between Bryant Ave & Faile St, Bronx, NY 10474 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.200(g)(1) · Accident prevention signs and tags
Serious$2,805$2,805Apr 5, 2011Final
Citation 1, item 1b
29 CFR 1926.201(a) · Signaling
Serious$0$0Apr 5, 2011Final
Citation 1, item 2
29 CFR 1926.651(l)(1) · Excavations
Serious$2,805$0Apr 5, 2011Final

Inspection 311226732 OPENED SEP 25, 2007Closed

Planned · Complete · Safety · 10 employees at the site · Closed Jan 22, 2008

405 Main Street, Roosevelt Island, NY 10044 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.651(h)(1) · Excavations
Serious$1,250$625Dec 5, 2007Closed
Citation 1, item 2
29 CFR 1926.652(e)(1)(ii) · Trench protection
Serious$2,500$1,250Dec 5, 2007Closed

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2019, the Brooklyn site logged 0 recordable injuries or illnesses among about 30 workers: 0.0 per 100 full-time workers, against a median of 1.0 for its industry.

Site and yearWorkersCasesDays-away casesRateIndustry median
Glenwood Road Project
Brooklyn · 2019
30 000.01.0

Severe injury reports

Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 2 reports on file.

Feb 27, 2017, College Point: Hospitalization · fractures · ankle(s)

An employee was shoveling dirt around a gas main pipe in a trench approximately 5' x 8' x 5'6" deep. A section of the trench caved-in breaking the employee's left ankle.

Feb 7, 2017, College Point: Hospitalization · fractures · foot (feet), unspecified

An employee was removing an attachment from a skid steer. He released the locking devices of the bucket and disconnected hydraulic hoses from the machine, but the bucket did not separate completely from the machine. The employee operated the machine and raised the bucket to check if debris was preventing it from disconnecting. When he came over to check the bucket, it dropped on and broke his left foot.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.200 · Accident prevention signs and tags

29 CFR 1926.200(g)(1)

(g) Traffic control signs and devices. (1) At points of hazard, construction areas shall be posted with legible traffic control signs and protected by traffic control devices.

29 CFR 1926.201 · Signaling

29 CFR 1926.201(a)

(a) Flaggers. Signaling by flaggers and the use of flaggers, including warning garments worn by flaggers, shall conform to Part 6 of the MUTCD (incorporated by reference, see § 1926.6).

29 CFR 1926.651 · Excavations

29 CFR 1926.651(h)(1)

(h) Protection from hazards associated with water accumulation. (1) Employees shall not work in excavations in which there is accumulated water, or in excavations in which water is accumulating, unless adequate precautions have been taken to protect employees against the hazards posed by water accumulation. The precautions necessary to protect employees adequately vary with each situation, but could include special support or shield systems to protect from cave-ins, water removal to control the level of accumulating water, or use of a safety harness and lifeline.

29 CFR 1926.652 · Trench protection

Other site preparation contractors employers in New York

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.