OSHA SearchOSHA records by employer

Interior Concepts Corporation: OSHA inspections and violations

Spring Lake, Michigan · Office Furniture (except Wood) Manufacturing · NAICS 337214

2inspections
8citation items
$1,350current penalties
May 14, 2019last inspection

OSHA has inspected Interior Concepts Corporation 2 times in Michigan since 1999.

The latest one began on May 14, 2019 as a planned inspection, in Spring Lake.

Those inspections ended with 8 citation items: 4 serious and 4 other-than-serious.

Penalties were first proposed at $2,700 and now stand at $1,350, 50% lower after settlements or reviews.

Lockout/tagout comes up most often in these citations: 3 items under 1910.147.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and Interior Concepts Corporation averages $1,350 (1 cited inspection).

Interior Concepts Corporation also files yearly injury logs with OSHA, summarized below.

Interior Concepts Corporation: OSHA citation items per year, 1999 to 2019
Citation items per year, by inspection date.

Michigan · latest 90 days of OSHA records

647employers cited

Get notified the morning OSHA posts each new citation in Michigan: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Michigan

Checking a subcontractor, a client or your own company? Watch Interior Concepts Corporation and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344005590 OPENED MAY 14, 2019Closed

Planned · Complete · Safety · 69 employees at the site · Closed Aug 5, 2019

18525 Trimble Ct, Spring Lake, MI 49456 · Office Furniture (except Wood) Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 408.12461(1)
Serious$1,500$750Jul 5, 2019Final
Citation 1, item 1b
29 CFR 408.12477(1)
Serious$0$0Jul 5, 2019Final
Citation 1, item 2a
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Serious$1,200$600Jul 5, 2019Final
Citation 1, item 2b
29 CFR 1910.147(c)(7)(i)(a) · Lockout/tagout
Serious$0$0Jul 5, 2019Final
Citation 2, item 1
29 CFR 1910.23(d)(4) · Ladders in general industry
Other-than-serious$0$0Jul 5, 2019Final
Citation 2, item 2
29 CFR 1910.146(c)(3) · Permit-required confined spaces
Other-than-serious$0$0Jul 5, 2019Final

Inspection 127149045 OPENED MAR 10, 1999Closed

Planned · Complete · Safety · 97 employees at the site · Closed Jun 17, 1999

18525 Trimble Court, Spring Lake, MI 49456 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Other-than-serious$0$0May 13, 1999Closed
Citation 1, item 2
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Other-than-serious$0$0May 13, 1999Closed

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the Spring Lake site logged 2 recordable injuries or illnesses among about 34 workers: 6.8 per 100 full-time workers, against a median of 3.3 for its industry. Those cases cost 4 days away from work.

Site and yearWorkersCasesDays-away casesRateIndustry median
Interior Concepts Corporation
Spring Lake · 2025
34 216.83.3
Interior Concepts
Spring Lake · 2021
38 000.03.3

Included with any plan: 4 more yearly logs from these sites, back to 2020, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.146 · Permit-required confined spaces

29 CFR 1910.146(c)(3)

(3) If the employer decides that its employees will not enter permit spaces, the employer shall take effective measures to prevent its employees from entering the permit spaces and shall comply with paragraphs (c)(1), (c)(2), (c)(6), and (c)(8) of this section.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(4)(i)

(4) Energy control procedure. (i) Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section.

29 CFR 1910.147(c)(6)(i)

(6) Periodic inspection. (i) The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed.

29 CFR 1910.23 · Ladders in general industry

29 CFR 4081.213

Other office furniture (except wood) manufacturing employers in Michigan

Alert subscribers get notified of each newly cited employer in Michigan the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.