OSHA SearchOSHA records by employer

International Precast Solutions LLC: OSHA inspections and violations

River Rouge, Michigan · Structural Steel and Precast Concrete Contractors · NAICS 238120

6inspections
39citation items
$38,200current penalties
Aug 21, 2026last inspection

Since 2019, OSHA inspectors have visited International Precast Solutions LLC in Michigan 6 times.

The most recent inspection opened on Aug 21, 2026 as a planned inspection, in River Rouge and is still open.

In all, OSHA issued 39 citation items: 32 serious and 7 other-than-serious.

The proposed penalties came to $76,400; today they stand at $38,200, 50% less.

The rule cited most here is 1910.1053 (silica dust in general industry), 5 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. International Precast Solutions LLC averages $9,550 across 4 cited inspections.

International Precast Solutions LLC also files yearly injury logs with OSHA, summarized below.

International Precast Solutions LLC: OSHA citation items per year, 2019 to 2026
Citation items per year, by inspection date.

Michigan · latest 90 days of OSHA records

653employers cited

7 of them in the same industry

Get notified the morning OSHA posts each new citation in Michigan: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Michigan

Checking a subcontractor, a client or your own company? Watch International Precast Solutions LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 349126813 OPENED AUG 21, 2026Open

Planned · Partial · Health · 168 employees at the site · Open

60 Haltiner Ave, River Rouge, MI 48218 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection so far.

Inspection 349117374 OPENED AUG 17, 2026Closed

Unprogrammed related · Partial · Safety · 1 employee at the site · Closed Sep 21, 2026

60 Haltiner Ave, River Rouge, MI 48218 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 346052319 OPENED JUN 22, 2022Closed

Unprogrammed other · Partial · Health · 160 employees at the site · Closed Aug 14, 2023

60 Haltiner Ave, River Rouge, MI 48218 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 408.11213(3)
Serious$3,500$1,750Oct 28, 2022Final
Citation 1, item 1b
29 CFR 408.11213(5)
Serious$0$0Oct 28, 2022Final
Citation 2, item 1
29 CFR 1910.146(c)(7)(iii) · Permit-required confined spaces
Other-than-serious$0$0Oct 28, 2022Final

Inspection 345989958 OPENED MAY 31, 2022Closed

Unprogrammed other · Partial · Health · 160 employees at the site · Closed Dec 21, 2022

60 Haltiner Ave, River Rouge, MI 48218 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.134(f)(2) · Respiratory protection
Serious$2,800$1,400Oct 28, 2022Final
Citation 1, item 2a
29 CFR 1910.1053(d)(1) · Silica dust in general industry
Serious$3,500$1,750Oct 28, 2022Final
Citation 1, item 2b
29 CFR 1910.1053(f)(2)(i) · Silica dust in general industry
Serious$0$0Oct 28, 2022Final
Citation 1, item 2c
29 CFR 1910.1053(h)(2) · Silica dust in general industry
Serious$0$0Oct 28, 2022Final
Citation 1, item 2d
29 CFR 1910.1053(j)(3)(i) · Silica dust in general industry
Serious$0$0Oct 28, 2022Final
Citation 2, item 1
29 CFR 1910.1053(k)(1)(ii) · Silica dust in general industry
Other-than-serious$0$0Oct 28, 2022Final
Citation 2, item 2
29 CFR 1910.1200(h)(3) · Hazard communication
Other-than-serious$0$0Oct 28, 2022Final

Inspection 345909998 OPENED APR 21, 2022Closed

Planned · Complete · Safety · 160 employees at the site · Closed Jul 21, 2022

60 Haltiner Ave, River Rouge, MI 48218 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 408.10015(1)
Serious$3,500$1,750Jun 24, 2022Final
Citation 1, item 2
29 CFR 408.10034(10)
Serious$3,500$1,750Jun 24, 2022Final
Citation 1, item 3a
29 CFR 408.10187(1)
Serious$2,800$1,400Jun 24, 2022Final
Citation 1, item 3b
29 CFR 408.11115(1)
Serious$0$0Jun 24, 2022Final
Citation 1, item 4 Serious$2,100$1,050Jun 24, 2022Final
Citation 1, item 5
29 CFR 1910.25(c) · Stairways
Serious$2,100$1,050Jun 24, 2022Final
Citation 1, item 6
29 CFR 1910.28(b)(1)(i) · Fall protection in general industry
Serious$3,500$1,750Jun 24, 2022Final
Citation 1, item 7
29 CFR 1910.28(b)(3)(i) · Fall protection in general industry
Serious$3,500$1,750Jun 24, 2022Final
Citation 1, item 8
29 CFR 408.10731(1)
Serious$3,500$1,750Jun 24, 2022Final
Citation 1, item 9
29 CFR 408.11223(1)
Serious$2,100$1,050Jun 24, 2022Final
Citation 1, item 10
29 CFR 408.12637
Serious$3,500$1,750Jun 24, 2022Final
Citation 1, item 11a
29 CFR 408.13312(1)
Serious$2,100$1,050Jun 24, 2022Final
Citation 1, item 11b
29 CFR 408.13350
Serious$0$0Jun 24, 2022Final
Citation 1, item 12a
29 CFR 1910.303(b)(7)(iv) · Electrical equipment, general requirements
Serious$2,100$1,050Jun 24, 2022Final
Citation 1, item 12b
29 CFR 1910.303(b)(8)(i) · Electrical equipment, general requirements
Serious$0$0Jun 24, 2022Final
Citation 1, item 12c
29 CFR 1910.303(g)(1) · Electrical equipment, general requirements
Serious$0$0Jun 24, 2022Final
Citation 1, item 12d
29 CFR 1910.303(g)(2)(i) · Electrical equipment, general requirements
Serious$0$0Jun 24, 2022Final
Citation 1, item 12e
29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods
Serious$0$0Jun 24, 2022Final
Citation 1, item 12f
29 CFR 1910.334(a)(3)(ii) · Using electrical equipment
Serious$0$0Jun 24, 2022Final
Citation 1, item 13
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$3,500$1,750Jun 24, 2022Final
Citation 2, item 1
29 CFR 408.10632(5)
Other-than-serious$0$0Jun 24, 2022Final
Citation 2, item 2
29 CFR 408.10833(1)
Other-than-serious$0$0Jun 24, 2022Final
Citation 2, item 3
29 CFR 1910.110(f)(2)(i) · Storage and handling of liquefied petroleum gases
Other-than-serious$0$0Jun 24, 2022Final
Citation 2, item 4
29 CFR 408.22141(2)
Other-than-serious$800$400Jun 24, 2022Final

Inspection 344187000 OPENED JUL 29, 2019Closed

Referral · Partial · Safety · 120 employees at the site · Closed Jul 15, 2020

60 Haltiner Ave, River Rouge, MI 48218 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

Incident on Jul 29, 2019: Employee falls into auger and amputates legs

At 7:30 a.m. on July 29, 2019, Employee #1, employed by a concrete construction company, was attempting to oil a Tuckerbilt concrete transporter while the auger conveyor was in the on/drive position and moving. In an attempt to oil the area around the auger conveyor, the employee stood on top of an open cover, directly above the operating auger conveyor. His foot slipped, and he fell into the moving auger. The employee's left and right legs were amputated. Emergency services arrived and transported the employee to the hospital, where he was admitted for treatment.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.28(b)(6)(i) · Fall protection in general industry
Serious$5,600$2,800Oct 15, 2019Final
Citation 1, item 2
29 CFR 408.11411(2)
Serious$5,600$2,800Oct 15, 2019Final
Citation 1, item 3
29 CFR 408.11412(1)
Serious$5,600$2,800Oct 15, 2019Final
Citation 1, item 4
29 CFR 408.11412(3)
Serious$5,600$2,800Oct 15, 2019Final
Citation 1, item 5
29 CFR 408.11441
Serious$5,600$2,800Oct 15, 2019Final

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the River Rouge site logged 12 recordable injuries or illnesses among about 135 workers: 5.9 per 100 full-time workers, against a median of 3.4 for its industry.

Site and yearWorkersCasesDays-away casesRateIndustry median
International Precast Solutions LLC
River Rouge · 2025
135 1205.93.4
International Precast Solutions
River Rouge · 2023
118 1108.33.4

Included with any plan: 3 more yearly logs from these sites, back to 2021, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1053 · Silica dust in general industry

29 CFR 1910.1053(d)(1)

(d) Exposure assessment—(1) General. The employer shall assess the exposure of each employee who is or may reasonably be expected to be exposed to respirable crystalline silica at or above the action level in accordance with either the performance option in paragraph (d)(2) or the scheduled monitoring option in paragraph (d)(3) of this section.

29 CFR 1910.1053(f)(2)(i)

(2) Written exposure control plan. (i) The employer shall establish and implement a written exposure control plan that contains at least the following elements:

29 CFR 1910.1053(h)(2)

(2) The employer shall not allow compressed air to be used to clean clothing or surfaces where such activity could contribute to employee exposure to respirable crystalline silica unless:

29 CFR 1910.110 · Storage and handling of liquefied petroleum gases

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.146 · Permit-required confined spaces

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.25 · Stairways

29 CFR 1910.28 · Fall protection in general industry

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.334 · Using electrical equipment

Other structural steel and precast concrete contractors employers in Michigan

Alert subscribers get notified of each newly cited employer in Michigan the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.