OSHA SearchOSHA records by employer

Ion Solar LLC: OSHA inspections and violations

Clackamas, Oregon · Commercial and Institutional Building Construction · NAICS 236220

2inspections
5citation items
$6,149current penalties
Jul 31, 2024last inspection

OSHA has inspected Ion Solar LLC 2 times in Oregon since 2022.

The latest one began on Jul 31, 2024 as a planned inspection, in Gresham; the case is still open.

Those inspections ended with 5 citation items: 2 serious and 3 other-than-serious.

Penalties were first proposed at $11,066 and now stand at $6,149, 44% lower after settlements or reviews.

Electrical equipment, general requirements comes up most often in these citations: 2 items under 1910.303.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Ion Solar LLC averages $3,074 (2 cited inspections).

Ion Solar LLC: OSHA citation items per year, 2022 to 2024
Citation items per year, by inspection date.

Oregon · latest 90 days of OSHA records

388employers cited

8 of them in the same industry

Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Oregon

Checking a subcontractor, a client or your own company? Watch Ion Solar LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347671851 OPENED JUL 31, 2024Open

Planned · Partial · Safety · 35 employees at the site · Open

843 W Powell Blvd, Gresham, OR 97030 · Solar Electric Power Generation · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-003-1501(1)
Serious$6,917$4,149Sep 3, 2024Final
Citation 1, item 2
29 CFR OAR 437-001-0760(1)(B)(C)
Serious$4,149$2,000Sep 3, 2024Final

Inspection 345745913 OPENED JAN 25, 2022Closed

Planned · Complete · Safety · 5 employees at the site · Closed Jun 10, 2022

9023 Se Jannsen Rd, Clackamas, OR 97015 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods
Other-than-serious$0$0Mar 22, 2022Final
Citation 1, item 2
29 CFR 1910.303(b)(2) · Electrical equipment, general requirements
Other-than-serious$0$0Mar 22, 2022Final
Citation 1, item 3
29 CFR 1910.303(g)(1) · Electrical equipment, general requirements
Other-than-serious$0$0Mar 22, 2022Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.303(b)(2)

(2) Installation and use. Listed or labeled equipment shall be installed and used in accordance with any instructions included in the listing or labeling.

29 CFR 1910.303(g)(1)

(1) Space about electric equipment. Sufficient access and working space shall be provided and maintained about all electric equipment to permit ready and safe operation and maintenance of such equipment.

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.305(b)(1)(ii)

(ii) Unused openings in cabinets, boxes, and fittings shall be effectively closed.

Other commercial and institutional building construction employers in Oregon

Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.